1. The Subject Of The Contract Is The Performance Of A Service Consisting In Emptying The Drainage Tank And Transport Of Living Sewage Manufactured At The Plant/Installation Managed By The Employer To The Sewage Treatment Plant, With Which The Contractor Has A Contract Signed. The Ordering Party Within Two Business Days Of Notification. 3. The Tribute Can Be Equipped With Measuring Devices In The Form Of A Flow Meter Enabling The Reading Of Downloaded Liquid Waste. 4. The Person Emphasizes That The Quantities Of Sewage To Receive Are Estimated Amounts That May Change, Which Are To Be Used To Prepare The Offer, With The Maximum Quantities Do Not Exceed The Estimated Total Amount Of Sewage To Receive During The Period Of The Contract Specified In The Contract Specified In Table 1. Due To The Amount Of Sewage Difficult To Predict, The Estimated Total Amount For Receipt May Change. Therefore, The Contracting Authority, In The Course Of The Contract, Reserves The Right To Limit This Amount By A Maximum Of 90%. A Reduction In The Amount Of Sewage In This Respect Will Not Give Birth To Any Claims On The Contractors Side In Relation To The Employer, In Particular For Payment Of Remuneration For An Unrealized Part Of The Contract And For Payment Of Compensation In Connection With The Reduction Of The Total Estimated Amount. In This Situation, No Annex Is Required. The Contracting Authority Guarantees The Contractor A Minimum Of 10% Of The Estimated Total Amounts Of Sewage For Pickup During The Period Of The Contract. 6. The Contractor Should Have The Ability To Transport Sewage In The Quantities Specified In The Contract With The Employer. 7. The Contractor Declares That He Has Relevant Permission To Conduct Activities In The Field Of Emptying Drainage Tanks And Transport Of Liquid Impurities Issued In Accordance With Art. 7 Of The Act Of 13 September 1996 On Maintaining Cleanliness And Order In Municipalities. 8. The Contractor Declares That He Has Valid Contracts With Sewage Treatment Plants That Undertake To Accept Domestic Sewage Supplied With The Transport Of The Contractor.9. The Contractor Undertakes To Pick Up Sewage With A Purse That Meets The Technical And Sanitary Requirements Entitling To The Removal Of Liquid Waste, And Allowed For Transport Road 10. The Contractor Is Obliged To Each Time Weighing Of Sewage On The Legalized Invasion Weight Located On The Plant.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.