Delivery Of It Hardware And Software, Including In Particular, The Supply Of Software In Accordance With The Quantitative Statement Below: 1. Purchase Of The Device Us 2 Pcs. 2. Purchase Of The Ups Device 1 Pc. 3. Purchase Of The Utm Device 1 Pc. 4. Purchase Of A Network Switch Type A 3 Pcs. 5. Purchase Of Sla Services For A Network Switch Type A 3 Pcs. 6. Purchase Of Software For Collecting And Analyzing Logs From Network Devices 1 Pc. 7. Purchase Of The 1 Pcs Server. 8. Purchase Of Network Cards 2 Pcs. 9. Purchase Of Virtualization Software 1 Pc. 10. Purchase Of Server Software Operating System 3 Pcs. 11. Purchase Of Hard Drives 14 Pcs. 12. Purchase Of A Network Switch Type B 2 Pcs. 13. Purchase Of A Network Switch Type C 1 Pc. 14. Purchase Of Subscription Licenses For The Utm 1 Item B) The Supplied Hardware And Software Must Be Brand New (I.E. Produced Not Earlier Than 9 Months Before They Are Delivered), They Must Come From The Official Manufacturers Sales Channel To The Polish Market, Come From Serial Production, Taking Into Account The Configuration Options Provided By The Manufacturer For The Offered Hardware And Software Model. C) Prototype Products Are Unacceptable, Long -Term Storage Devices And Manufacturers Sale Programs Are Not Allowed. The Devices May Not Be On The End-Of-Sale, End-Of-Off-Support, End-Of-Life Manufacturer.D) The Required Quantity And Distribution (Outside The Housing) Of Any Ports Cannot Be Achieved As A Result Of The Use Of Converters, Adapters, Etc., It Is Not Allowed To Use Any External Adapters Or Converters. E) All Devices Will Be Powered Directly From The 230V Network. F) The Contractor Will Provide Delivery To The Indicated Location At The Headquarters Of The Ordering Party. G) The Contractor Is Responsible For Configuring Physical And Logical Connections, Connecting And Configuring Devices For Action, Allowing You To Start Work And Provide The Right Amount Of Power Cables, Connecting To Prepare The Ordered Equipment For Operation. H) The Contractor Is Obliged To Configure The Ordered Equipment In Consultation With The Ordering Party. Employer. J) The Contractor Will Be Required To Submit As -Built Documentation, Containing In Particular All Data Access To Devices And Software That Will Be Used During Installation And Configuration Of Hardware And Software. Authenticity. The Contractor Is Obliged To Provide Brand New Software (Including The Operating System) Unused And Never Previously Unscrewed On Another Device And From A Legal Source Of Sales. In The Case Of Software, The Hologram Sticker Should Be Protected Against The Possibility Of Reading The Key By Means Of Security Used By The Manufacturer, Provided That The Manufacturer Of The Offered Software Uses Such Protections. The Employer Reserves The Right To Verify The Supplied Software At The Stage Of Evaluation Of The Offers As Well As At The Delivery Stage In Terms Of The Legality Of The Software Directly At The Software Manufacturer. The Employer Reserv
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.