Modular And Portable Buildings-Clemens-Dülmer School: Raum Cell System. Container System 1: The Container System 1 Is A Two -Storey Interim Solution With A Flat Roof, Which Each Has Four Classrooms Per Floor. In Both Floors, Two Classrooms Are Connected To Each Other Over Doors, So That A Escape Route Can Be Carried Out Over The Neighboring Classroom. The Floors Are Connected Or Developed With A Staircase Including A Podium Made Of Steel Construction And Grid Rust Stages. The Containers Are Founded On A Compacted Gravel Application Layer. The Development Takes Place On The Part Of Stresemannstraße And Klausenerstraße In Connection With The Existing Network Of Paths. The Access Of The Containers Is Connected To The Existing Paths By A Paving Surface. Container System 2 Has Already Been Procured. Container System 3: The Container System 3 Is A Single -Storey Interim Solution That Has The Sanitary Facilities. Inserted In 3 Room Cells, The System Includes 3 Toilets For Boys And Girls, 2 Toilets For Women And Men (Teachers) And A Wheelchair -Friendly Toilet. The Containers Are Founded On A Compacted Gravel Application Layer. The Development Takes Place On The Part Of Stresemannstraße And Klausenerstraße In Connection With The Existing Network Of Paths As Well As The Existing Paved Extension Of The Existing System.Wurd
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.