Tenders Are Invited For Construction Of Water And Sewage Infrastructure In The Rural Area Of The City And Commune Of Kikół - Expansion Of The Water Supply Network In Moszczonne
Tenders Are Invited For Construction Of Water And Sewage Infrastructure In The Rural Area Of The City And Commune Of Kikół - Expansion Of The Water Supply Network In Moszczonne
The Subject Of The Order Is The Design And Construction Of Two Sections Of The Water Supply Network In Moszczonne. The Need To Build Sections Of The Water Supply Networks Results From The Need To Deliver Water Recipients Corresponding To The Regulation Of The Minister Of Health Of 7 December 2017 On The Quality Of Water Intended For Human Consumption. (Journal Of Laws 2017 Item 2294). The Water Supply Network Is To Ensure Water Supply For Consumer And Sanitary -Hygiene Needs In The Above -Mentioned Town And Water To The Needs Of Fire Protection In The Above -Mentioned Town. The Purpose Of The Order In The Construction Of A Segment Of The Water Supply Network Is To Supply The Water Supply Water Of Buildings Intended For Permanent And Periodic Stay Of People. The Investment Is To Allow Access To The Drinking Water To A Wider Group Of Residents Of The Kikół Commune. All Materials Used To Make The Water Supply Must Be In Accordance With The Act On Construction Products, They Must Have Current Pzh Approvals Allowing Contact With Drinking Water. The Material Manufacturer Is Obliged To Have An Iso 9001 Certificate Or Other Equivalent Quality Management System. Realization Of The Entire Scope Of The Order Requires The Design And Construction Of Two Sections Of The Water Supply Network With The Parameters Assumed Below: • Water Supply Network - Pe Pipe Ø 110Mm X 10.0Mm, Sdr11 110 X 10.0 Pn16; L = 671 M, • Water Supply Connections To The Boundaries Of The Plots (Reaching Up) - Pe Pipes Ø 32Mm X 3.7Mm, Sdr11, Pn16 - 43 Pcs Dn80 - 7 Pcs. Note: The Length Of The Network Are Landmarks Resulting From Actual Distances In The Field Between Points Constituting The Limits Of The Range. The Final Values In The Field Of Diameter And Length Of The Network Will Be Determined By The Contractor Based On Detailed Calculations In Consultation With The Employer. The Selection Of Work Technology For Individual Sections Of The Network Is An Element Of Design Work, And Thus Is The Contractors Obligation. The Construction Methods Are Taken By The Contractor, They Should Provide All The Required Functional And Utility Parameters Specified In Pfu. The Complex Description Of The Subject Of The Contract Has Been Specified In The Functional And Use Program. They Will Prove To Be Necessary For Proper Performance And Transferring The Subject Of The Contract For Use.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.