1. As Part Of The Order, You Must Renovate The Playground At The City Nursery In Ropczyce. 1.1. The Subject Of The Contract Includes A Renovation Of The Playground At The City Nursery In Ropczyce, At Ul. Armii Krajowej 7, 39-100 Ropczyce, Located On Plot No. 2351/9 In Ropczyce, Including; - Dismantling Of Existing Elements Of Small Architecture, - Renovation Of Polyurethane Surface At The Site Of An Existing Playground, - Assembly Of New Elements Of Small Architecture On Polyurethane Surface And Lawn. 1.2. For Safety Reasons, During The Implementation Of The Task, The Area Where Works And Storage Materials Will Be Carried Out From Use By Fencing And Marking Warning About The Construction Works Carried Out. 1.3. There Are Active Parking Lots In The Nursery. Therefore, Work Should Be Carried Out In Such A Way That They Do Not Prevent Or Hinder The Use Of These Parking Lots Also During Work. 1.4. Works, Especially The Supply Of Mass Materials (Aggregates, Concrete) Should Be Organized In A Safe Way For The Existing Pavement Surface. 2. The Scope Of Works Listed In Point 1.1. It Should Be Made Based On The Design Documentation Constituting Annex 2 To Swz, The Bill Of Quantities Constituting Annex 3 To Swz And On The Conditions Specified In The Template Of The Contract Constituting Annex 4 To Swz. 3. In The Event Of Unidentified Field Collisions, The Inability To Perform The Task In The Adopted Works Technology Or Other Events Preventing The Performance Of The Subject Of The Contract According To The Solutions Adopted In Design Documentation, The Costs Of Possible Replacement Solutions Are On The Side Of The Contractor. 4. Under The Contract, The Contractor Is Also Obliged, Among Others To: 1/ Execution Of The Necessary Attempts, Tests, Measurements, Security, Inclusion And Technical Acceptance, Along With Fees, If Required, 2/ Perform Photographic Documentation Of The Position Of The Place Of Work Before The Commencement Of Works, During The Work And After Their Completion In The Electronic Version And Its Disclosure At The Request Of The Ordering Party, 3/ Maintaining The Passage Of Streets And Access Directly Adjacent To The Plot And In Its Area, 4 Whether Damaged Roads, Fences, Pavements, Etc. Damaged During The Works Of Works, And Restoring The Construction Area To The Previous State, 5/ Keeping Construction Documentation, Settlement According To The Requirements Of The Task Co -Financing Program, Including The Preparation Of The As -Built Cost Estimate, 6/ Preparation And Transfer Of The Documents Required To Perform The Contract, Including The Statement Of The Construction Manager, Works Manager On The Acceptance Of The Construction Obligation, Managers Statements Of The Construction Manager Confirming The Preparation Of A Safety And Health Protection Plan, A Certificate Of Belonging To The Chamber Of Construction Engineers, Preparation Of The Safety And Health Protection Plan, Etc. As Well As To Perform The Necessary Attempts, Acceptance, Rese