General Definition Of The Subject Of The Public Procurement The Subject Of The Project Is The Complete Project Preparation Of A New Building Of 2 Apartment Buildings On The Parcel Number 248/15 In The Town Of Paskov To Support Available And Sustainable Rental Housing. The Implementation Of The Project Will Thus Lead To An Increase In Rental Housing Capacity. Implementation Of The Project Is An Essential Step To Increase The Capacity Of Rental Housing In Paskov With A Total Of 11 New Apartments. The Outputs Of The Project Are In Line With The Project Goals. Characteristics Of A New Building Of Apartment Buildings The Subject Of The Project Documentation Will Include A New Building Of 2 Apartment Buildings, Ground Floor + 2 Floors. One Apartment Building Will Have 6 Apartments, The Other Will Have 5 Apartments And One Space For Commercial Use. Overall, There Will Be An Increase In Housing Buildings In Paskov By 11 Apartments. The Non -Residential Space For Commercial Use Is Determined In Accordance With The Challenge And Will Be A Maximum Of 20 % Of The Total Floor Area Of The Building. In The Case Of The First New Building Of An Apartment Building, Where One Space For Commercial Purposes, There Will Be Non -Residential Space For Commercial Use Of 13.15 % Of The Total Area Of Apartments. In The Case Of Counting The Total Floor Area Of The Building, The Percentage Will Be Reduced, So The Call Condition Will Be Observed. The Second New Building Of An Apartment Building Will Not Have Space For Commercial Purposes. Urban Design Will Be Followed When Processing Project Documentation. The Land On Which Apartment Buildings Will Be Located Is Situated In The Main Part Of Paskov In A Built -Up Area. As Part Of The Transport Infrastructure, New Apartment Buildings Will Be 280 Meters From The Bus Stop And Directly On The Main Road Of Paskova Bělská Street, Which Connects To The D56 Motorway. The Availability Of Both Public And Passenger Transport To Work, Education And Leisure Activities Will Be At A High Level. The Apartment Buildings Are Located Within 1 Km Of The Elementary School And Kindergarten Paskov. The City Center Will Be From New Buildings Of Apartment Buildings On Average 500 Meters - About 7 - 8 Min Walking (Square, Restaurant, Playground, Grocery), On The Next Street There Is Immediately The Municipal Office, Castle Paskov, Fire Station, Cinema, Sports Hall Etc .. The Project Will Respect Logical Arrangement Of Interior, Simple Orientation In The House, Stay Quality. At The Site Of The Designed Building (Local Part Of Paskova), The Archive Boreholes Are Closest To About 200 M, Which Caught The Flood Clays (0.0-1.5 M) And Aquarium Sand Gravel (1.5-5.6 M), From Depth 5.6 M Then Pre-Pre-Warranty Background (Which Horns Water And Impermeable). The Groundwater Level Is Here At A Steady Level Around 1.2 M Below The Terrain. The Geological Conditions Of The Building Can Be Described As Complex. Therefore, A Hydrogeological And Engineering-Geological Survey Will Be Carried Out For The Construction Permit Scope For The Building Permit. - 3 Core Boreholes To Render Pre -Lattice Subsoil At The Expected Depth Of 6 M Supplemented As Needed By Static Or Dynamic Penetration - 1 Hydrodynamic Test For Verifying Groundwater Inflows Into Building Excavation And For Designing Water Levels During Construction While Setting The Aggressiveness Of The Environment And Measures Against Waterlogging Of The Building - Laboratory Analyzes, Infusion Test, Or Other Way Of Conclusive Proposal For Non -Conflict Spending Of Rainwater Within The Meaning Of Čsn 75 9010, In The Form Of Expression Of A Hydrogeologist As A Basis For Decision To Permit For Water Management. The Contractor Will Guarantee The Accuracy And Safety Of Its Design Design, And In The Case Of Finding Unexpected Anomalies, A Detailed Survey Will Ensure A Complementary Geological Survey To Clarify The Foundation And Drainage Conditions. The Project Must Be Taken Into Account By Environmental Requirements Specified In Article 12 Of This Document - Responsible Public Obscure And Innovation. The Subject Of The Public Contract Is In Particular: (A) The Elaboration Of The Feasibility Study And Pre -Project Preparation (Especially The Provision Of Documents From The Administrators Of The Network, Geodetic, Semi -Writer And Altitude Focus, Dendrological Survey, Engineering Geological Survey And Hydrogeological Survey, Radon Survey), B) Execution Of Complete Design And Engineering Activities, In Particular The Elaboration Of All Documents Needed To Issue The Authorization Of The Project, To Ensure Other Measures Of Public Administration Or Other Acts Allowing The Construction, Except For The Construction Documentation, And Proof Of Submission Of All Necessary Applications To Public Administration Authorities, (C) Elaboration Of All Necessary Documentation For The Construction Of The Building, D) Processing Of The Maintenance And Repair Plan, Ensuring The Assessments Necessary For Processing The Subject Of Support, E) The Performance Of The Designer Supervision - Continuously From The Protocol Handover Of The Construction Site To The Contractor Of The Building, Throughout The Construction Of The Construction, Until The Warranty Period For The Construction. The Project Documentation Will Be Processed In The Form And Scope Stipulated By Decree No. 131/2024 Coll., Decree On Documentation Of Buildings, As A Valid And Effective Wording. Minimum Content Of Project Documentation: Content Of Documentation For Building Permit The Content Of The Documentation For The Construction Of The Construction Is Determined In Annex 1 To Decree No. 131/2024 Coll., Decree On Documentation Of Buildings. Content Of Documentation For Building Construction The Content Of The Documentation For The Construction Of The Construction Is Determined In Annex 8 To Decree No. 131/2024 Coll., Decree On Documentation Of Buildings. Be Careful! The Contractor Of The Construction Work Will Be Selected On The Basis Of A Tender Procedure Implemented Under The Public Procurement Act. In View Of This Fact, The Project Documentation Must Be Processed In Accordance With The Provisions Of The Zzzz § 89 (5) And (6). “(5) If This Is Not Justified By The Subject Of The Public Contract, The Contracting Authority Must Not Favor Or Disadvantage Certain Suppliers Or Products By Determining The Technical Conditions Through A Direct Or Indirect Reference To (A) Certain Suppliers Or Products, Or B) Patents For Inventions, Utility Patterns, Industrial Patterns, Trademarks Or Designation Of Origin. (6) Reference Pursuant To Paragraph 5 (A). (A) Or B) The Contracting Authority May Use If The Technical Conditions Of Technical Conditions Pursuant To Paragraph 1 Cannot Be Sufficiently Accurate Or Understandable. For Each Such Link, The Contracting Authority Shall Indicate The Possibility To Offer An Equal Solution. ”