Preliminary Services Juscelino Kubitschek Street - Supply And Placement Of Galvanized School School #26, Esp. 0, 45Mm, Dimension (3X1, 5) M, Plotted With Vinyl Adhesive, Posted With 4, 8X40mm Rivets, In Metalon 20X20mm Metal Structure, Esp. 1, 25Mm, Including Self-Clavated Eucalyptus Support Painted With Pva Ink Two (2) Coats, Drainage 01 Rua Juscelino Kubistschek-Curb Guide, In Concrete With Fck 20Mpa, Pre-Molded, Mfc-01 Der-Mg, Dimensions (12X16, 7X35) Cm, Exclusive Gutter, Including Excavation, Apimolization And Transportation Materialscavado (In Bucket), Drainage 02 Rua Juscelino Kubistschek -Urban Concrete Gutter (Scu), Type1, With 15 Mpa Fck, 3%Slope Width Of 3%, Esp.7Cm, Deer -Mg Standard, Half -Meal Exclusive, Apilation And Transportation With Excavated Material (In Bucket), 2Nd Rua Juscelino Kubistsschek Street - Regularization Of The Subleite, Pavement 02 Rua Juscelino Kubistschek - Stock Soloty Base Granulometrically Without Mixing With Deposit Material., 14/07/2025, Pavement 03 Rua Juscelino Kubisschek - Acquisition Of Base Deposit Material - Gravel. Paved., Pavement 05 Rua Juscelino Kubistschek - Execution Of Pavement With Interlocked Floor, Hexagon Type, Esp. 8Cm, With 35Mpa Fck, Including Sand Mattress, Esp. 6Cm, For Settlement, Mechanized Compaction, Cargo And Mechanical Discharge In Truck, Exclusive Transportation., Paving 06 Rua Juscelino Kubistschek - Transport With 14 M³ Tilting Truck - Paved Highway. Implementation… .., Signalization 02 Juscelino Kubistschek Street - Galvanized Metal Support For Warning Plate Ouregulation - 0, 60 M Side Or Diameter - Supply And Implementation. Painted With Pva Ink Two (2) Coats, Drainage 01 Pastor Renato De Andrade Street, Silvio Borges And Roberto Marinho-Half-Fire Guide, Mfc-01 Standard Der-Mg, Apiraling And Transportation With Redwilled Material (In Bucket), Drainage 02 Pastor Renato De Andrade Street, Silvio Borges And Roberto Marinh-Urban Concrete Get (Scu) De Andrade, Silvio Borges And Roberto Marinho - Regularization Of The Subline, Pavement 02 Pastor Renato De Andrade Street, Silvio Borges And Roberto Marinho - Stabilized Solometrically Solo Base Without Mixing With Deposit Material, Passover 03 Pastor Renato De Andrade Street, Silvio Borges And Roberto Marinho - Acquisition Of Base Disery Material Borges And Roberto Marinho - Transportation With 14 M³ Tilting Truck - Pavimentaded Highway, Pavement 05 Pastor Renato De Andrade Street, Silvio Borges And Roberto Marinho - Execution Of Interlocked Floor, Exclusive Interlocked Floor Transportation, Passover 06 Pastor Renato De Andrade Street, Silvio Borges And Roberto Marinho - Transportation With 14 M³ - Signal. 01 Pastor Renato De Andrade Street, Silvio Borges And Roberto Marinho - Steel Regulation Plate D = 0, 60