In The School Center In Brilon, Consisting Of The Heinrich Lübke School (Hls) And The Petrinum Grammar School (Pet), A Pollution (Pcb, Kmf) Was Determined, Whereupon A Concept From Partial Renovation, Partial Dismantling And Partial Construction Was Developed. The Metal And Glazing Work That Is Advertised In This Lv Refers To The New Building Cluster Of The Petrinum. This Is A Reinforced Concrete Skeleton Structure With Reinforced Concrete Ceilings And Non -Carrying Outer Walls. The Outer Walls On The Ground Floor Are Bricked Up Massively, The Outer Walls On The Upper Floors Are Then Built In Wooden Frame Construction And Blamed/Screwed In The Blankets From Reinforced Concrete.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.