General Project Description The Undisturbed Remains Of The Bottle Barracks Was Built And Increased The Old Building Wing Of The Womens Clinic After The Second World War. In The 1950S, The Clinic Was Supplemented By The Hearing Room And In The 1960S By The Slope (Component B5) To The East (Component B5), Which Was Extended To The Property Boundary In The Basement Area With A Flat Building (Component B6). At The Southern End, A Staircase On Component B2 Was Built In The 1990S, Through Which The Lying Down Of The Womens Clinic Is Currently Being Organized. In 2015, Fire Protection-Related Reverberations Were Already Carried Out. In The Framework Of The Womens Clinic Measure, However, Further Fire Protection-Related Sound-Related Measures Are Required For Most Areas Of The Womens Clinic. In The Meantime, The Updated Fire Protection Assessment Of The Building Complex In The Form Of A Fire Protection Concept, Which Shows The Deficits In The Area Of Fire Protection. External Walls / Inner Walls (Vertical Construction Constructions) In Principle, The Spatial Structures Of The Bed Areas In The Slope Wing And The Other Areas Of The Womens Clinic Are Essentially Adopted. When Planning The Floor Plan, It Was Possible To Keep Static Interventions As Low As Possible And Always Where, Taking Into Account The New Use In The Corresponding Sub-Areas, The Existing Spatial Structures Should Be Maintained. In The Essential Areas Of The Womens Clinic, Window And Window Doors Are Already Installed (Only Exchange/Adaptation Of Exceeding, E.G. Surveys Bt 5+6 And Partially Of Windows With Ornament Glazing Required). In Addition, The Essential Outdoor Windows Are Already Equipped With The Venetian Blinds, So That An External Shading Has Already Been Guaranteed. The Interior Doors Of The Womens Clinic Have No Uniform Concept, Here Within Individual Stations And Even Within Individual Rooms (E.G. Bedroom In Component 5), Different Door Frames And Door Leaves Are Installed. In Addition, Many Of The Doors Set Up In The Necessary Corridors, So That The Direction Of Impact Must Be Adapted Here So As Not To Affect The Escape Routes. The Door Leaves Are Also Damaged In Parts. (Flaps Of The Layer, Broken Corners, Etc.). The Interior Doors Are Therefore To Be Replaced / Dismantled / Transferred. In Addition, According To The Fire Protection Concept For The Fire Protection Renovation, Additional Fire And Smoke Protection Doors Are Required, Existing Fire Protection Doors Do Not Meet The Requirements And In Part. On The Basis Of The Structural Interventions, Wallpaper And Tiles Must Be Renewed In Many Areas. This Only Has A Low Height In Some Areas Of Existing Wall Protection System (Including New Altitudes Due To Altitude Adjustable Bed). According To The Inventory, The Wall Coverings Are (Also In The Bedroom Areas) Defective (Rejection / Incorrect Points / Incorrect Bores). The Wall Coverings Make A Bad Overall Impression In Most Areas. Since Fiber Fiber Tissue Is Not Used For Selective, The Planned Wall Surfaces In The Corresponding Rooms Must Be Re -Occupied. In The Tiled Wall Areas, There Are Various Damage Due To Previous Installations. The Furnishings Must Also Be Adapted To The New Uses.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.