Tenders Are Invited For Modernization Of Sports Facilities In The Oborniki Śląskie Commune - Modernization Of The Sports Hall At The School And Preschool Complex In Oborniki Śląskie
Tenders Are Invited For Modernization Of Sports Facilities In The Oborniki Śląskie Commune - Modernization Of The Sports Hall At The School And Preschool Complex In Oborniki Śląskie
Scope Of Work: I. Sports Hall:- Supplementing Plaster Cavities And Numerous Cracks On The Walls- Painting The Walls With Oil Paint To A Height Of 2.60M Above The Floor, Above Latex Paint- Setting And Dismantling Of Scaffolding And Ladder- Protection With Window Foil, Doors, Etc. Before Painting- Washing After Plastering And Painting Works. Sports Hall Facilities: 1. Rooms With Spray, Sinks And Toilet:- Replacement Of Door Joinery- Assembly Of New Wings With Three Hinges With Signs, Repair Of Steel Frames With Hinges Complement, Putting Down And Painting Of The Door Frames- Demonstration Of Shower Pads And Cabin- Demolition Of Ceramic Wall Cladding And Floors,- Modernization Of Internal Water Installations- Construction Of New Installations Aqueous From The Boiler Room To Manifolds In The Corridor - From Pipes Made Of Carbon Steel On Both Sides With Diameters: Heat And Cold Water 42 Mm And 28 Mm Circulation And Pex Pipes From Pex Pipes From Distributors To Receivers, Replacement Of Mixers And Concealed Cabinets Locked, Replacement Of Sets Of Time Spray Spraying (Time Battery To The Mixed Water (Time Battery. With A Button, The Body Made Entirely Of Chrome Brass, The Ability To Regulate Water Flow, Outflow Time About 30 Seconds, Chrome Spray Spout, Resistant To Vandalism And Anti-Level, With Automatic Flow Control;- Replacement Of Standing Faucets (Chrome, Chrome, Height For The Bottom Of The Spout Min. 100 Mm, Ceramic Head)- Ceramic Head)- Modernization Of The Internal Sewage System In Spray And Toilet - New Approaches To Mounting Linear Dehydration - Furrows In The Floor; Installation Of Linear Dehydration From Stainless Steel With An Increased Width Of The Grille Up To 100 Mm, Outflow Of Stainless Steel Siphon Diameter 50 Mm, Modules 2.0 And 1.0 M Connected Along The Entire Length Of The Room In Two Rows With Walls With Walls With Walls With Walls Spray, Make A Connection Of The Dehydration Body With The Grounding System Of Electrical Installations, - Replacement Of The Washbasins - Width 50 Cm, Stainless Steel Siphons With A Cork Strain - Replacement Of Standing Toilet - New On Frames With Drainage Approaches With A Board And A Button; - Making A Wist Insulation On Walls And Floors In Spraying And Buffer Zone And Bugs On Spraying And Buffet Pipelines,- Bricking Furrows And Complementing Plasters- Making New Ceramic Cladding Walls Made Of Tile In 30X60 Cm Format, Toilet Frame Housing, Pasteing Mirrors In The Plane Of Tiles Above The Sinks (Mirror Height 50 Cm Wide 40 Cm)- Colors Of Tiles To Be Agreed With The User- Supplementing The Substrates- Making New Floors From Anti-Slip Plates R11 In 30X30 Cm Format With Decreases To Line Drainage And Grilles - Colors To Be Agreed With The User - Putting Down And Painting Walls And Ceilings - White Latex Paint, - Assembly Of Shower Cabins With Hpl - Two Cabins In Each Room Of Shower (4 Kpl. Corridor And Connector:- Protection Or Unscrewing And Re-Screwing The Cloakroom Hangers- Supplementing The Defects I
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.