Part 1 Order: Development Of Project Documentation, Renovation And Equipment 1. The Order Of The Contract Includes The Performance Of Works In The Following Material Scope: • Development Of Project Documentation (Construction Project And Technical Specification Of Construction And Acceptance Of Construction Works) Necessary To Complete The Scope Of Works Specified In This Part Of The Order, • Renovation Of The Roof Of The Hall, Replacement Of Drain Pipes And Flashings, • Renovation Of The Sports Hall Through The Housing Through The Housing Central Heating Pipes Painting The Design Of The Hall Girders, Installation Of Shut -Off Valves And Thermostats On Radiators, • Renovation Of The Bathrooms Of Sanitary And Skate Facilities - Replacement Of Tiles And Equipment, • Renovation Of The Connector And The Driveway For The Disabled, • Hall Equipment - Including: Protective Liner, Protective Nets, Handball Goals And Volleyball Posts. 2. The Design Documentation Includes The Implementation Of A Construction Design And Technical Specifications Of Construction And Acceptance Of Construction Works. Documentation Should Be Developed In Traditional (Paper) Form Two Copies And On An Electronic Medium In Public Format *.Pdf With The Possibility Of Searching In Text Studies. 3. The Subject Of The Contract For Part 1 Also Includes The Supply Of Equipment Referred To In The Documentation (Functional And Utility Program Descriptive Part A, Point 1.2.13 Equipment Delivery) -List No. 10.1 To Swz) 4. The Gathering Description Of The Subject Of The Contract Was Specified In: Document Description Of The Subject Of The Contract (Annex 10 To Swz) And In The Documentation (Annex No. 10.1 To Swz).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.