Tenders Are Invited For Development Of Doc. Design And Coster For The Task Entitled Changing The Use Of A Historic Manor House In Mosty, Kosakowo Commune To A Public Building With The Option
Tenders Are Invited For Development Of Doc. Design And Coster For The Task Entitled Changing The Use Of A Historic Manor House In Mosty, Kosakowo Commune To A Public Building With The Option
3 At The Outset, The Contractor Is Developed By The Contractor With A 3-War Urban-Architectural Concept (Hereinafter Referred To As The Concept) In The Area Covered By The Investment Intention, Then On The Basis Of The Selected Variant Approved By The Contracting Authority, Developing A Complete Multi-Branch Design Documentation (Construction And Executive Projects, Technical And Executive Specification, Technical Specification And Receipt. Works As Well As The Bill Of Quantities And Cost Estimate) Along With Obtaining All Opinions, Arrangements, Permits And Other Documents Required By Detailed Provisions And Necessary To Build Planned Facilities, In All Necessary Industries. For The Developed Documentation, The Contractor Will Obtain The Final Decision Of The Building Permit On Behalf Of And For The Contracting Authority. 3. Documentation, Constituting All The Studies, Should Be Developed Based On Guidelines, Recommendations And On The Principles Formulated By The Ordering Party Later In This Study And Its Attachments. These Guidelines Should Be Used Directly Unless The Concluded Contract Provides Otherwise. A Derogation From The Guidelines May Occur, If The Applicable Provisions Constitute Otherwise - The Contractor Is Obliged To Immediately Notify The Contracting Authority About The Creation Of Such A Situation - Or If The Solution Proposed By The Designer (Contractor) Will Receive The Approval By The Contracting Authority. 4. The Contractor Is Obliged To Obtain The Documentation With The Employer. 5. In The Scope Of The Contract, The Contractor, On Behalf Of The Ordering Party, Will Be Obliged To Develop At The Design Stage Of All Applications, Including For Issuing A Decision On The Building Permit And Introducing Any Changes Or Supplementations To The Above -Mentioned Applications, Which Will Prove To Be Necessary In Connection With The Course Of Administrative Proceedings Or Favorable For The Implemented Subject Of The Contract Or Will Be Required By A Provision. 6. The Order Also Includes The Need To Immediately Remove Defects And Defects At The Contractor, In Particular The Preparation Of Additional Drawings And Descriptions, If The Project Documentation Insufficiently Explains Technical Solutions And Immediate Performance Of Corrections And Supplementations In The Project Documentation As Well As The Provision Of Answers And Explanations In The Course Of The Procedure For Granting The Contract For The Contractual Robot Contractor Of The Documentation. 7. The Documentation Should Be Recorded In The Form Of Scans On The Cd.8 Medium. A Detailed Description Of The Order Was Included In The Description Of The Subject Of The Contract Attached To Swz Together With The Attachments To It Constituting Annex 7 To Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.