The Plowing Work Includes Plowing Of The Lanes And Light Traffic Routes Maintained By The City Of Laitila. The Work Includes Roadways, Light Traffic Routes And Parking Screens And Pockets Along Them, As Well As A Junction Between The Carriageway And The Light Traffic Route (Extensions Of The Intermediate Green Lane). The Contractor Plows The Snow The Least Disturbance To The Location Of The Road User, This Is Done In The So -Called. If Necessary, 0-30 Meters As Needed. Snow Driving Is Not Included In The Contract, It Will Be Done As Additional Work On A Separate Request. The Plow Areas Are Divided Into Three Different Entities. The Areas Are Marked On Attached Maps (Maps 1, 2 And 3). The Bidder Must Be Familiar With The Plowing Destinations On The Spot Before Submitting The Offer. The Contractor Selected Before Commencing Plowing Work Makes The Area A Plowing Plan And Approves It With A Representatives Representative. The Snowstorm Or Pile Of Plowing Is Left In The Fishing Areas, Not On The Plots. The Plowing Barn Created By Real Estate Connections Is Part Of The Owner Of The Plot. Lumia Must Not Be Assembled At The Crossings Or So That They Interfere With Visibility. Plow Work Is Carried Out In Curb -Free Areas About 20 Cm Above The Edge Of The Pavement And At The Curb, Down To The Curb. If Necessary, Plow Sticks Will Be Installed For The Location Of The Roadway And The Curb, If Necessary. Plowing Sticks Are Borrowed From The Subscriber And Returned To The Subscriber When The Contract Period Is Expired. The Damage Caused By Winter Maintenance Must Be Reported Immediately To The Customers Representative Or The Mine And Valve Damage To The Laitila Water Supply Office On 050-5501363. In The Event Of Breaking The Wells Folder And Some Other Structure, The Plowing Work Must Ensure That The Damage Does Not Pose A Danger To Others. The Contractor Is Responsible For Any Accidents He Or She Caused, Property Or Environmental Damage. The Sanding Work Is Not Included In The Plowing Work. The Anti -Skidding Is Carried Out In An Hourly Basis And Ordered From The Most Affordable Provider. The Sanding Sand Needed Is Obtained By The Subscriber. There Are Two Different Grain Sizes 4/8 And 0-8. 4/8 Crushing Is Primarily Used For Carriageways And 0-8 Screened Natural Crabs On Walking And Cycling Routes. 4/8 Crushes May Also Be Placed On Walking And Cycling Routes If It Makes Sense For The Work Phase. The Use Of The Nature Daux 0-8 Is To Be Avoided On The Carriageway. Plowing And Sanding Work Are Carried Out On The Order Of The Laitila Winter Maintenance Duty Officer Or Work Manager. The Contractor Must Be Prepared To Work Within 60 Minutes Of Ordering Work. The Order Is Made From The Call Or The Whatsapp Application, Which Must Be Used By Contractors. There Is No Compensation For A Self -Employed Winter Departure. The Contractor Also Has The Opportunity To Ask For A Departure By His Own Announcement If It Seems That The Snow Will Be Tangled On The Fairways. The Work Will Be Carried Out Continuously So That The Start Prefers To The Morning, Before 6:30 Am And First On Light Traffic Routes. After That, Plowing And Sanding Are Continued On The Main Roadways. The Plowing Area Should Be Treated Within 8 Hours Of Plow Request.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.