The Work Must Include Sanding The Yard And Parking Areas For Winter Seasons 2023-2024 And 2024-2025. Borderline Bike Paths, Tiled Paths, Etc. Are The Responsibility Of The Property Manager. Sanding Work Begins Immediately When The Need Arises. The Time Of The Sanding Work After The Snow Removal Is Agreed With The Site Plowing Contractor. The Areas Must Be Sanded By 7.00 In The Morning. The Sanding Between 7.00-17.00 Is Agreed With The Property User Separately. Other Exceptions To The Time May Be Agreed On A Property -Specific Basis. The Sanding Seam Is Supplied By The Subscriber To Teollisuustie 5, Where The Contractors Apply For The Number Of Cribs They Need. The Sanding Gambling Of The Village Schools Can Also Be Delivered Directly To The Properties, The Operating Method Can Be Agreed With The Selected Contractor. At Least Euro 4 /Stage Iiia Emission Rating Is Required For The Equipment. The Trace Of The Sanding Work Must Be Comprehensive, More Than 0.5 M2 Of Empty Spaces Are Not Allowed. Responsibilities: The Contractor Must Have Statutory And Collective Insurance, Liability Insurance And Equipment Motor Insurance. Or In Accordance With Diligence.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.