The Work Must Include Plowing In Yard Areas And Parking Areas For Winter Seasons 2023-2024 And 2024-2025. The Plowing Area Is Mainly A Property Yard With A Walkway And Driveway And Parking Areas. Borderline Bike Paths, Tiled Paths, Etc. Are The Responsibility Of The Property Manager. Plowing The School Playgrounds And Hockey Rinks Can Be Agreed With The Selected Contractor Separately. The Area To Be Plowed Must Be Checked Before The Plowing Season Begins In The Event Of Possible Well Covers, Asphalt Spots, Bumps, Stones, Etc. The Subscriber Will Take Care Of The Surface Structure Of The Yard And, If Necessary, Fix The Problem Areas Or Negotiate With The Selected Contractor. The Contractor Has The Opportunity To Add Plowing Sticks To Make The Plowing Work Easier. The Plowing Work Begins Immediately When The Snow Thickness Exceeds 4 Cm. However, The Work Can Be Started Earlier At 5 Pm And The Areas Must Be Plowed By 7.00. Plowing Between 7.00-17.00 Is Agreed With The Property User Separately. Other Exceptions To The Time May Be Agreed On A Property Basis. Snow Should Not Be Left On The Passage Or Parking Areas. The Need For Snow Removal Will Be Notified To The Technical Supervisor. At Least Euro 4 Emission Rating Is Required For The Equipment. The Imprint Of Plowing Work Should Be Roughable, (Eg Network Blade) And Does Not Allow Slippery Traces. Responsibility Obligations: The Contractor Must Have Statutory And Collective Insurance, Liability Insurance, And Motor Insurance Of The Equipment. The Contractor Or The Employer Of The Work Contractor Shall Be Obliged To Compensate For All The Disadvantages And Damage He Has Caused To The Subscriber Or Third Party, Provided That The Work Of The Contractor Could Not Be Avoided In Accordance With All The Care Or Care.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.