Tenders Are Invited For Improving The Energy Efficiency Of Public Buildings In Hłomcza, Kostarowce, And Writers

Tender Detail

99033672
GKI.271.25.2025
Self-Funded
Tenders Are Invited For Improving The Energy Efficiency Of Public Buildings In Hłomcza, Kostarowce, And Writers
NCB
central europe
European Union
23-07-2025

Work Detail

1. The Subject Of Part 1 Of The Contract Are Construction Works On The Task Entitled Improving The Energy Efficiency Of Public Buildings In Hłomcza, Kostarowce, And Writers, I.E. Improving The Energy Efficiency Of The Building Of The Village Culture Center In Homłcza. 2. A Detailed Description Of The Subject Of The Order In The Scope Of Part 1 Of The Order Can Be Found In Annex 1 To Swz. It Consists Of The Following Documents: 1) Design Documentation, 2) Issues Of Works. 3. Due To The Fact That The Remuneration Will Be The Cost Estimate Of The Works Of Works Attached To Swz Are Binding. The Contractor Is Obliged To Draw Up An Offer Cost Estimate (Offer Cost Estimates) Based On The Number Of Works Received From The Employer, Using The Price Base He Adopted To Cost And After Adding Vat. An Offer Cost Estimate (Offer Cost Estimates) Must (Must) Be Compatible (Compatible) With The Bill Of Quantities And Should (Should) Contain The Basis For The Valuation Of The Works, A Description Of Works In Accordance With The Description Included In The Preface Of The Works, The Measure Used In The Pre -Works Of The Works And The Flat -Rate Net Unit Price For Each Item Of The Predominates (Predominations). An Offer Cost Estimate (Offer Cost Estimates) Should Be Prepared In Accordance With Point 13.8 Swz. Note: If The Design Documentation Attached To Swz Includes A Wider Range - The Scope Of Works Included In The Daily Works Should Be Taken For The Valuation. 4. Equivalent Solutions. In Each Case Of Use In The Description Of The Subject Of The Order Of Norms, Technical Assessments, Technical Specifications And Technical Reference Systems Referred To In Art. 101 Para. 1 Point 2 And Para. 3 Of The Public Procurement Law, The Contractor Should Assume That Such As Accompanied By The Words Or Equivalent. In The Case Of Use In The Bill Of Quantities, Design Documentation References To Standards, European Technical Assessments, Approval, Technical Specifications And Technical Reference Systems, The Ordering Party Allows Equivalent Solutions. The Contractor, When Analyzing The Project Documentation, The Number Of Works Should Assume That Each Reference Used In The Project Documentation, The Pre -Emptive Of Works Is Accompanied By A Or Equivalent Word. In The Case, When In The Project Documentation, The Pre -Works Of The Works Have Been Used Trademarks, Which Means That They Are Given, For Example And Specify The Minimum Expected Qualitative Parameters And The Required Standard. The Contractor May Apply Equivalent Materials Or Devices, But With Technical And Quality Parameters Not Worse Or Better, The Use Of Which Will In No Way Negatively Affect The Proper Functioning Of The Solutions Adopted In The Project Documentation. The Contractor Who Uses The Equipment Or Equivalent Will Be Obliged To Show During The Performance Of The Order That The Devices And Materials He Used Meet The Requirements Set By The Contracting Authority. Use In The Project Documentation. The Bill Of Q

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail