Tenders Are Invited For Making The Kruszwica Gt Geothermal Hole - 1 To Recognize The Resources Of Thermal Waters From The Lower Jury In The Kruszwica Region
Tenders Are Invited For Making The Kruszwica Gt Geothermal Hole - 1 To Recognize The Resources Of Thermal Waters From The Lower Jury In The Kruszwica Region
Common Dictionary Of Orders: Cpv 45255500-4 - Drilling And Mining Robots 45111200-0 - Works In The Field Of Land Preparation For The Construction And Work Of Ziemnycpv 71331000-7 - Drilling Services Engineering Services 71351910-5 - Geological Servicescpv 71355200-3 - Carrotal Research: Months From The Date Of The Contract. Subject Of The Contract: 1. The Subject Of The Contract Is The Performance Of The Kruszwica Gt Geothermal Hole-1 For Recognizing The Resources Of Thermal Waters From The Lower Jury In The Kruszwica Region. The Work Of The Works Is The Search And Recognition Of Thermal Waters In The Lower Jury And Optionally Lower Chalk By Making The Search And Reconnaissance Hole In The Area Kruszwica. Calculation Includes The Search For Search And Reconnaissance Of The Vertical Geothermal Hole Of Kruszwica Gt-1 To The Designed Depth Of 3290 M (± 10 %). The Hole Should Be Found To Enter The Ceiling Of The Lower Jurys Works At A Depth Of About 2750, The Geological Extent Will Correctly Correct The Assumptions Of The Geological Works Project In Terms Of The Depth Of The Well (In Relation To The Assumptions Of The Project), The Structure Of The Opening, The Scoring System, The Grurn System And Testing. The Exact Way Of Filtering And The Depth Of The Foundation Of Individual Columns Of Pipes Will Determine Geological Supervision In Consultation With The Department Of The Department On The Basis Of The Results Received And Geological Situation In The Hole. The Order Of The Contract Includes All The Work Necessary For The Proper Implementation Of Drilling Of The Geothermal Hole, Enabling Obtaining Optimal Parameters Of Thermal Water Intake, And In Particular: A) As Well As All Necessary Documents And Studies For The Proper Performance Of The Drilling Hole And Geological Works; B) Obtaining Before The Start Of The Works All Decisions And Permits Necessary To Start Geological Works, And Especially The Territorially Competent Decision Of The District District Of The Mining Office Approving The Movement Plan For The Performance Of The Drilling Hole And Geological Works; C). Technological And Negative Impact Of The Drilling Process, Preparation Of The Square And The Background Of The Drilling Area, Installation Of Devices And Installations, Equipment And Equipment, Supplying The Construction Site With The Media: With Energy, Water And Sewage Collection, Execution Of A Temporary Tank Of Dropping Water, Etc.) Hole (Pipe Columns: 18 5/8 , 13 3/8, 9 5/8 , 7, Filter Column), Armament Of The Opening Outlet; E) Performing Geophysical (Hole) Tests After Each Section Of The Opening (Diameter And Curvature Of The Hole, Lithological And Stratigraphic Profile, Falling Of The Layers, The Falling Of The Layers, Interval Transmitted In The Panels Deposit Zone, State Of Cementing Cladding Pipes), Production Log Test For The Complex Zone, Measuring The Temperature Distribution In The Hole For The Entire Hole; F) Consumption Of Crumbs And Cores During The Drilling Of The
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.