1. The Subject Of The Order Is The Supply Of Electricity With An Estimated Volume - 1,500.00 Mwh. The Data Is Indicative. 2. The Number Of Measuring Systems Settling Used Electricity 1 Pc - A Detailed Description Is In Annex 1 To Swz3. The Forecast Amount Of Electricity, Which Is The Subject Of The Contract, Is Indicative And May Differ From The Contract Actually Collected During The Period. The Amount Of Electricity Was Estimated On The Basis Of Planned Use, Historical Data With Electricity Consumption (12 Months). The Contractor Should Take Into Account Possible Fluctuations In Electricity Consumption. The Reduction Or Increase In The Amount Of Electricity Does Not Attract Any Consequences For The Contracting Authority, Except For The Need To Pay For The Amount Of Energy Actually Collected. 4. The Seller Will Change Once Again. 5. The Contracting Authority Has A Distribution Agreement Concluded For An Indefinite Period. 6. There Are No Sources Of Electricity Production In Ppe. During The Duration Of The Contract Concluded As A Result Of The Resolution Of The Proceedings In Question, The Employer Does Not Plan To Launch Installations Producing Electricity. 7 Qualitative Standards1) The Subject Of The Contract Are The Supply Of Electricity With Specific, In Accordance With Applicable Regulations, Quality Standards. 2) Electricity Quality Standards Are Described In The Pe Act And In The Regulation Of The Minister Of The Climate And Environment Of October 13, 2023. On The Detailed Conditions For The Operation Of The Power System. The Rules For Shaping And Calculating Tariffs And Settlements In Electricity Are Set Out In The Ordinance Of The Minister Of The Climate And Environment Of November 29, 2022 (As Amended). 8. Cpv Code, Under Which The Subject Of The Contract Was Classified: 09300000-2-Electric, Heat, Sunny And Nuclear Energy09310000-5-Electricity9. Deliveries Will Be Carried Out From 01/01/2026. Until 31/12/202610. The Current Agreement Was Concluded For A Timely Time Until 31.12.2025. And Does Not Require Termination. 11. The Measuring System Is Adapted To The Seller Change Procedure. 12. Settlement Period-1 Month 13. The Contracting Authority Does Not Divide The Order Into Parts - The Order Is Indivisible. 11. The Contracting Authority As A Reserve Supplier Indicates Enea S.A. With Its Registered Office In Poznań. 12. The Condition For Starting Electricity Supply On Time Is A Positive Conduct Of The Seller Change Procedure. 13. The Contracting Authority Has A Legal Title To The Object. 14. The Employer Does Not Provide For The Awarding Of Orders Referred To In Art. 214 Para. 1 Point 8 Of The Public Procurement Law 15. The Contracting Authority Does Not Conduct Proceedings To Conclude A Framework Agreement. 16. The Employer Does Not Allow The Submission Of Variant Offers And In The Form Of Electronic Catalogs. 17. The Contracting Authority Does Not Require A Local Vision And Checking The Documents Necessary To Perform The Contract (Article
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.