Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
11-07-2025
Work Detail
Quotation are invited for E Station Rft Tank Q2a Painti 1032503104 E station RFT tank Q2A painting work For more details. Contact: ibrahim.alqa@dewa.gov.ae, 0503455524 rashed.alali@dewa.gov.ae 1 ITEM-00001 E STATION RFT Q2A- TANK ROOF, STAIRS AND HANDRAILS HYDRO-BLASTING AND PAINTING WORK,SURFACE FINISH WJ2.- TANK SHELL HYDRO-WASHING AN D PAINTING WORK,TANK DIAMETER 17 METERS, HEIGHT 12 METERS,CONTRACTOR SCOPE:- SITE VISIT TO INSPECT TANK AND SCOPE OF WORKSUBMIT MO BILIZATION PLAN, METHOD OF STATEMENT, RISK ASSESSMENT.- TOOL BOX TALK TO BE CONDUCTED DAILY COPY TO BE SUBMITTED TO DEWASUPERVISORMANPOWER TO BE EQUIPPED WITH FULL PPE AND FAMILIAR WITH WORKING ATHEIGHT AND SAFETY REQUIREMENTS.- CONTRACTOR SUPERVISOR TO BE ALWAY S AVAILABLE AT WORK LOCATION.- MOBILIZATION OF REQUIRED MANPOWER AND TOOLS TO CARRY OUT THE REQUIREDBLASTING AND PAINTING WORK.- CAR RY OUT BLASTING AND PAINTING WORK AS REQUIRED- HOUSEKEEPING TO BE CONDUCTED DAILY, WORK AREA TO BE KEPT CLEAN.- WASTE MANAGEMENT AS PER DEWA RULES AND REGULATION- SUBMITTING DAILY PROGRESS REPORT- SUBMIT FINAL INSPECTION REPORT AND WORK COMPLETION REPORTDEWA SCOPE :- SCAFFOLDING- GATE PASS- PTW- PAINT MATERIALFOR INFORMATION AND SITE VISIT KINDLY CONTACTIBRAHIM.ALQA@DEWA.GOV.AE, 0503455524AHMED .ELSHERBENY@DEWA.GOV.AE; 0525657754RASHED.ALALI@DEWA.GOV.AEE STATION MMD BOILERNOTES TO CONTRACTORS:##CONTRACTOR SHOULD VISIT THE SI TE TO UNDERSTAND THE SITE CONDITIONS,CONTRACT SCOPE, AND INTRICACIES OF THE WORK TO ENSURE THAT THEY FULLYUNDERSTANDS THE SCOPE OF W ORK FOR DESIGN, ENGINEERING, AND COSTESTIMATION.##NO CLAIMS FOR EXTRA PAYMENTS SHALL BE ACCEPTED FOR ANY ADDITIONALMATERIALS OR WORK S THAT WERE FOUND REQUIRED AT THE TIME OF EXECUTION OFTHE WORK DUE TO LACK OF UNDERSTANDING OF THE SCOPE, EXTENT OF WORK,PLANT/SITE RESTRICTIONS, UNDERESTIMATION OF THE SCOPE, ETC.,##IRRESPECTIVE OF BEING EXPLICITLY OR IMPLICITLY MENTIONED IN THETENDER SPECIFICATI ON CONTRACTOR SHALL NOTE, ALL TECHNICAL ANDENGINEERING REQUIREMENTS ESSENTIAL TO COMPLETE THE SCOPE OF WORK AREINCLUDED IN THIS TEND ER DOCUMENT.##ANY AMBIGUITIES OR DISCREPANCIES BETWEEN CONTRACTOR#S OFFER AND THISTECHNICAL SPECIFICATION AFTER AWARD OF THE CONTRAC T SHALL BE RESOLVED BYTHE DEWA, WHO SHALL THEN INSTRUCT THE CONTRACTOR THEREON.INTERPRETATION, CHANGE, OR CORRECTION MADE BY DEWA WI LL BE BINDING FORTHE CONTRACTOR IN THIS REGARD WITHOUT ANY ADDITIONAL COST TO DEWA.##NO CLAIMS FOR EXTRA PAYMENTS SHALL BE ACCEPTED FOR DE-MOBILIZATIONAND REMOBILIZATION OR WAITING TIME OR IDLE TIME DUE TO DEWA#SOPERATIONAL CONSTRAINTS OR OTHER CRITICAL MAINTENANC E ACTIVITIES CARRIEDOUT BY DEWA AT THE SITE. 1 AU STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332501684)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.