Motor Rectification Light Vehicles - Complete Engine Rectification, Including Supply Of All Engine Assembly Parts. The Engine Should Be Removed And Delivered Reinstalled, Regulated And Running, With Electrical Review, The Proponent Should Provide New And 1St Line Parts Necessary For Engine Assembly, Besides The Filters And Oleos For The Reviews Planned During The Warranty, At Least 12 (Twelve) Months And Without Kilometer Limits. The Pieces To Be Replaced: - Trill Change, Crankshaft Change, Bielal Bearing Change, Piston Change, Shirt And Rings, Full Head Of The Head, Oil Pump Change, Water Pump Change, Oil Change, Oil Change, Filter, Candles And Complete Rectification Of The Head. Full Head Of The Head., 07/08/2025
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.