GTR 98971472
Tenders Are Invited For Construction Work - Design (In The Field Of Srk Industry) And Comprehensive Execution Of Construction Works On The Railway Line No. 622 On The Section F+J Podłęże R401 - Gdów / Podłęże R301 - Podłęże Balachówka As Part Of The Project Entitled: Construction Of The New Railway Line Podłęże - Szczyrzyc - Tymbark / Mszana Dolna And Modernization Of The Existing Railway Line No. 104 Chaboka - Nowy Sącz - Stage Ii
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
98971472
Tendering Authority
Subscribe to view
Tender No
444293-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Work - Design (In The Field Of Srk Industry) And Comprehensive Execution Of Construction Works On The Railway Line No. 622 On The Section F+J Podłęże R401 - Gdów / Podłęże R301 - Podłęże Balachówka As Part Of The Project Entitled: Construction Of The New Railway Line Podłęże - Szczyrzyc - Tymbark / Mszana Dolna And Modernization Of The Existing Railway Line No. 104 Chaboka - Nowy Sącz - Stage Ii
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
31-07-2025
Closed
Work Detail
Construction Work - Design (In The Field Of Srk Industry) And Comprehensive Execution Of Construction Works On The Railway Line No. 622 On The Section F+J Podłęże R401 - Gdów / Podłęże R301 - Podłęże Balachówka As Part Of The Project Entitled: Construction Of The New Railway Line Podłęże - Szczyrzyc - Tymbark / Mszana Dolna And Modernization Of The Existing Railway Line No. 104 Chaboka - Nowy Sącz - Stage Ii. 1. The Subject Of The Contract Is The Performance Of The Following Elements: Design And Execution Of Works For The Task Entitled Construction Of A Building Object Entitled: Railway Line No. 622 Podłęże R401 - Gdów At Episode F 0+000 To Km 17+487 Together With Technical Infrastructure Along The Railway Line No. 622 On A Section From Km 0+000 To Km 17+487 And Demolition, Reconstruction, Expansion And Construction Of The Railway Line No. 91 On The Section From Km 14+400 To Km 15+200 Together With The Technical Infrastructure Along The Railway Line No. 91 On The Section From Km 12+421 To Km 18+498 And Construction Of A Building Object: Kolejnica 627 Podłęże R301 - Podłęże Balachówka At 0+000 To Km 1+928 And Demolition, Reconstruction, Expansion And Construction Of The Railway Line No. 95 On The Section From Km 30+750 To Km 31+250 (Track No. 1) And From Km 31+150 To Km 32+050 (Track No. 2) With Techical Infrastructure At Km 29+093 To Km 33+341 . Z I Z And All Of The Subject Of The Contract Includes The Implementation Of The Following Elements: 1) Project Documentation, Including: A) Development Of An Executive Project (Srk Industry), B) Development Of As -Built Documentation, Including Geodetic As -Built Documentation, 2) Works In The Areas Described In Opz And Pfu: A) Surface And Support, B) Drainage And Hydrotechnical Works, C) External Networks, C) External Networks, C) External Networks, C) External Networks, C) D) Roads, E) Railway Traffic Control Devices (Srk), F) Telecommunications Devices And Systems, G) Traction Network And Power Supply And Control System, H) Line Of Non -Move Needs (Lpn); I) Devices And Electricity Systems Up To 1 Kv, J) Engineering Facilities With Accompanying Works, Including A Railway Tunnel With Injection, K) Perons, Travelers And Cubature Facilities, L) Transitions And Travels, M) Geological And Geological Works, N) Works Related To The Implementation Of Elements Of Small Architecture, Environmental, P) Any Other Task Necessary To Carry Out In Accordance With Applicable Regulations. 3) Works Consisting In The Construction Of Facilities For Environmental Protection. 4) Conducting The Process Of Assessing The Compliance Of Structural Subsystems In The Scope Covered By The Order At Each Stage (Design, Construction And Final Rehearsals Of The Subsystem) And The Transfer Of Relevant Declarations Of Verification And Verification Certificates For Subsystems. The Interface Option Includes The Implementation Of Cooperation With Other Contractors Carrying Out Construction Works Or Delivery To The Employer, And Which Require Connection With Railway Traffic Control Devices Built As Part Of This Task. Cooperation Will Take Place Through The Ordering Party And/Or Engineer. The Contracting Authority Provides That The Scope Of Work Carried Out Under Other Contracts Affects The Need To Make, Among Others Changes In Interfaces (I.E. Implementation Under This Task Of The Interface Options). The Detailed Range Of The Interface Options Has Been
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
5b547e2e-2192-48db-be2b-b8e4eb44f168.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)