The Site Has Been Prepared And Approved By An Investment Project, Which Is An Integral Part Of The Procurement Document. The Technical Prescriptions And Requirements Related To The Implementation Of The Construction Works Are Described And Framed In The Technical Specification And The Investment Project, Both In Terms Of The Type And Specification Of The Individual Materials Used, As Well As In The Manner And Technology Of Implementation. In View Of Which, With Respect To The Technical Specifications For The Implementation Of This Site, Those Specified In The Investment Project, The Technical Specification And The Ccc, Which Are Part Of This Documentation, Should Be Used. The Construction Is The Reconstruction Of The Fence Of The Building Of Sofia University V. Levski-Initial Stage, Krumovgrad In Pi And Identifier 39970.501.94 According To The Cckp, Rd-18-96/30.12.2009. Of Agcc Id. The Fence Is Located Entirely Within The Boundaries Of The Property - Owned By The Contracting Authority. The Purpose In The Implementation Of The Site Is To Update The Fence Of The School In Accordance With The Current Regulatory Requirements. It Is Envisaged To Replace The Existing Openwork With A Higher Construction, As Well As The Construction Of A New Reinforced Concrete Belt. The New Construction Will Be Built Along The Way, Fully Coinciding With The Route Of The Existing Fence. Overall Length Of The Fence: 395.00 M. Provided Construction And Assembly Activities: - Dismantling Of The Existing Openwork Steel Fence. - Delivery And Installation Of A New Openwork Metal Fence. The Metal Stakes Will Be Anchored On The Existing Belt Before Pouring The New Reinforced Concrete Belt. - Construction Of A New Reinforced Concrete Belt On The Existing One, In Order To Enhance The Cracked Areas, The Corruption Of The Interviewed Stakes, The Inclination Of The Flow Of Atmospheric Outside The Fence, As Well As The Protection Of The Joints From Further Compromise. - The Entire Fence On The Northeast Part Will Be Reinforced By Pouring Concrete About 10 Cm Thick. For This Purpose, A Trench Excavation Will Be Made Without Undermining The Foundations Of The Existing Fence. - Installation Of An Additional 4,00 M Height Fence, Tilted On Steel Stakes, In The Southwestern Part Of The Yard - In Front Of The Court Tennis Playgrounds. The Nets For The Net Will Be Massively Founded. The Construction Is The Sixth Category In Accordance With The Spatial Planning Act (Zut), Ordinance No. 1 Of July 30, 2003 On The Nomenclature Of The Types Of Construction. All Activities And Technical Characteristics Of The Envisaged Materials Are Indicated And Described In Detail In The Attached, Investment Project, Ccc And The Technical Specification To This Public Procurement.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.