Technical Building-Inspection Services-Awarding Of Technical Building Management (Operator Contract) In Potsdam (Voek 043-23). Continuation From Section 2.1-Two Weeks After The Contract Is Given, The Personnel Presentation, Customer-Specific Adaptation Of The Cafm System And Clarification Of The Implementation Of Data, Clarification And Coordination Of The Processes Must Be Carried Out Maintenance Planning, Repair And Reporting. A Week Later, The Systems And Technical Systems, Their Documentation, The Management Of The Spare Parts/Wear Parts/Assemblies And Warehousing Are To Be Taken Over. The System Documentation Must Be Checked And Set Up According To The Given Documentary Guideline, Risk Assessments And Subcontract Overviews Must Be Created. - The Regular Operation For Compound And New Building Begins On June 1St, 2026. -In The Start-Up Phase And For Regular Operation, An Object Manager And A Representative Are To Be Held. A Total Of 3 In-House Technicians (Ht), 2 Ht Of The Field Of Electrical Engineering Or Comparable, 1 Ht Of The Specialization Of Supply Technology, E.G. For Sanitary, Heating, Ventilation And Air Conditioning Technology Or Comparable For The Compound. 2 Ht, One Ht Of The Aforementioned Disciplines, Are Required For The New Building And For Representation. -For The Takeover Of The Compound And The New Building In The Start-Up Phase, The Extended Security Check According To § 9 Süg (Sog.Ü2) Is Required For The Employee Of The An Used. The Willingness To Apply For A Certificate Of Good Conduct (Bzr Exam) Are Available For The Use Of The An. -The An Puts A Sufficient Personnel (Start-Up Team), With Which A Smooth And Complete Transition Of The Service Can Be Carried Out To The An. The Start-Up Team Must Belong To The Proposed Object Manager And A Project Manager (Pl) Experienced With Object Takeovers. - The Property Manager Is Present From 8:00 A.M. To 4:00 P.M., The Ht From 6:00 A.M. To 10:00 P.M. The An Must Be Accessible At All Times. - The An Must Have Contemporary Cafm Software With Web-Based Access For Planning, Execution And Documentation Of Maintenance And Repair Services On Buildings And Technical Systems. It Provides 10 Access Licenses. Minimum Functions Are - Planning, Surveillance, Documentation Of All Maintenance, Inspection And Maintenance Measures - Recording And Evaluating Technical And Commercial Data From Building Management And Maintenance As Well As Consumption And Meter Data - Documentation And Monitoring Of All Manufacturer Guarantees And Warranty - Transparency Via The Resources Used - Avoidance Of Media Breaks And Dual Work - Consistent Data Management- Documentation Ability, Historization And Archiving This Must Meet The It Security Requirements Of The Bsi And Implemented In An Operating Environment Certified In Accordance With Iso 27001 Based On Iso 27001
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.