Insulated Wire And Cable-Honkanummen 110 Kv Gis Extension. In 2027, Vantaan Energia Sähköverkot Oy (Later The Subscriber) Will Expand The Honkanummi 110/20 Kv Substation To Honkanummi In Vantaa. This Acquisition Includes All The 110 Kv Process Equipment Required For The Substation For The Substation, Except For Messagers And Energy Meters. This Acquisition Includes A Gas-Insulated 110 Kv Extension And Protective Systems And Control Systems In The Honkanummi Cutting Plant F-Gas Regulation. The Procurement Also Includes The Process Cables Of The Extension, Including The Grounding Of The Switchgear, Designed, Installed, Wired, Fully Operational, Deployed And Documented.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.