Project Consists Of Stabilization Of A Landslide Located At 11.5 Km On The Ashton Mara East (Skyline) Fsr. Works Will Include:Drilling, Blasting, Loading And Hauling Of Rock Material Required For The Channel Works And Slope Stabilization.Removal And Disposal Of The Existing 800Mm Culvert, 600Mm Culvert And Flume, And Existing Log Crib Retaining Wall At The Site.Placement Of Rip Rap To Stabilize Creek Channel. Removal Of Existing Landslide Material And Placing A Rockfill Buttress. Excavation And Disposal Of Over Steepened, Unstable Material Associated With The Landslide Siteschedule Cof The Major Works Contract Nrs625 Will Be Added Week Of July 7Th, 2025