The Subject Of The Contract Is The Renovation And Modernization Of The Rooms Of The Poviat Vocational Activity Department In Łęczna Under The Pfron Program Of Equalizing Differences Between Regions Iii. The Scope Of Renovation And Construction Works Will Include The Following Pzaz Rooms In Łęczna: Vestibule (Room 1), Technical Room (No. 55), Packaging Magazine (Room 3), Delivery Chamber (Room No. 2), Potato And Vegetable Warehouse (Room 5), Silage Magazine (Room No. 6), Potato And Vegetable Peeling. Disabled (Room No. 8), Womens Toilet (Room No. 9), Mens Toilet (Room No. 10), Social Room (No. 11), Order Room (No. 12), Warehouse Art. Suchych (Room 18), Egg Warehouse With Disinfection (Room No. 19), Corridor (Room 23) In Accordance With The Pre -Trend Constituting An Attachment To Swz. Womens Cloakroom, Womens Toilet, Nps Toilet (Rooms No. 20+21+22), Cloakroom, Mens Toilet, Np From Ceramic Tiles, C) Dismantling Floors From Tiles On Cement Mortar, D) Disassembly Of The Luminaires, E) Dismantling Of The Coffered Ceiling, F) Dismantling Of Hygiene And Sanitary Devices, G) Dismantling Of Anesthetics With A Diameter Up To 200 Mm, H) Disassembly Of Installation Connectors, I) Disassembly Of Plug Sockets, J) Forging From The Wall Of Steel Frames And Disassembly Of The Door (Including External Doors In Room No. 2), K), Resulting In Unevenness At A Depth Of Forms Up To 1 Cm On Walls And Floors, L) Demolition Of Existing Partitions, M) Dismantling Of Electrical Installations In Terms Of Demolition And Reconstruction Rooms, N) Installation Of External Aluminum Glazed Doors (Pattern In Accordance With Currently Used), O) Installation Of Interior Metal Doors With A Frame, P) Floors Made Of Stoneware Tiles For Glue Measuring 60X60 With The Preparation Of The Substrate. The Contracting Authority Requires Waterproofing. 5Th Class Abrasion Of Anti -Slip R11, Resistance To A Minimum Spot Of 4, Pattern To Be Agreed With The Contracting Authority, Joints Made Of Epoxy Joints, Q) Liating The Walls With Ceramic Tiles (Matte Tiles) 30X60 Per Glue, Up To A Height Of The Floor (Room 6, 12 Resistance To A Minimum Of 4, A Formula To Be Agreed With The Contracting Authority, Welds Made Of Epoxy Joints, R) Assembly Of Swords With Diam. Up To 200 Mm, P) Checking Ventilation, T) Double Painting With Emulsion Paints Along With Priming Internal Surfaces - Walls And Ceilings. Washable Paints Resistant To Scrubbing, U) Installation On The Ready Ground Of Installation Connectors-Assembly Of New Connectors In Accordance With The Standards Of Availability, V) Installation To The Finished Substrate Of Plug Sockets-Assembly Of New Sockets In Accordance With Availability Standards, W) Installation Of Hygiene And Sanitary Devices For People With Disabilities In Accordance With The Standards Of Availability Along With The Adaptation Of Availability Along With The Adaptation Of Water-Sewage Approaches. (According To Din 18024-2), X) Installation Of Led Lighting Fixtures, Y) Installation Of P