Tenders Are Invited For Regis Shaft Maintenance On The Level Iii-Iv

Tender Detail

98891522
KSW/2025/TRG/86
Self-Funded
Tenders Are Invited For Regis Shaft Maintenance On The Level Iii-Iv
NCB
central europe
European Union
22-07-2025

Work Detail

3 Mining Robots Will Include: 1) Crumbling Of The Abyss, Reinforcement And Equipment Elements, 2) Repair And Sealing Of The Shaft Housing On The Section From Level Iii To Level Iv.3. The Maximum Scope Of Mining Works Is Determined By The Bill Of Quantities Below: 1) Execution Of The Working Platform According To The Design - 1 Pc., 2) Formation, Removal Of Salt Growths - 630 M2,3) Cleaning The Girders Over A Length Of 40 M (Girders Every 3 M) - 13 Pcs., 4) Repair And Injection Of Wet And Dry Features: Crushing And Cleansing Of The Gap And Cleaning Of The Gap, Switching Gap And Build Injection Packers, Sealing Injection, Liquidation Of Packers And Injection Openings - 220 M, 5) Concrete Repair: Removal Of Damaged Concrete, Supplementing The Defects With Hand -Made Reprofilating Materials On The Backed Surface - 15 M2.6) Discontinue The Spoil From Cleaning - 70 M3.4. The Subject Of The Contract Will Be Implemented In Two Stages: 1) Stage I, Including: A) Developing And Agreeing On A Technical Design Together With The Technology Of Performing Works And A Technical Bridge Design For Mining Works (Hereinafter Referred To As A Technical Design), Including Inventory Of Wet And Dry Gaps As Well As Areas Of Moisture And Concrete Losses, Selection Of Injection Material For Application Conditions (The Size Of The Gaps And Degrees Moisture Of Possible Outflows), Selection Of Equipment And Methods Of Repair And Sealing, B) Obtaining Permission Of The Conservator Of Cracow Monuments Of Salt (Hereinafter Referred To As Kzkżs) To Perform Mining Works Covered By This Agreement, 2) Stage Ii Covering Mining Works, Including: A) Performance Of The Working Platform According To The Approved Project, B) 630 M2), C) Cleaning The Girders Over A Length Of 40 M (Girders Every 3 M), D) Repair And Injection Of Wet And Dry Scratches: Disorder And Cleansing Of The Gap, Blinding The Gaps And Buildings Of Injection Packers, Sealing Injection, Liquidation Of Packers And Injection Holes (About 220 M Of Fabrics), E) Concrete Repairs: Removal Of Damaged Concrete, Supplementing The Defects With Hand -Made Reprofization Materials On The Activated Surface (About 15 M2), F) I Put Off The Spoil From Cleaning. 5. As Part Of Mining Works, The Contractor Is Also Obliged To: 1) Organize A Square (Area) Of Works, 2) Provide Materials Necessary To Carry Out Mining Works, 3) Provide Machines And Devices Necessary To Perform Mining Works, 4) Provide Persons With Appropriate Permissions And Qualifications To Supervise Mining Robots. 6. As Part Of The Implementation Of The Subject Of The Contract, The Contractor Is Obliged To Develop A Technical Project. 7. The Technical Design Should Also Include A Workbel Design For Mining Works. 8. The Contracting Authority Will Provide The Care Of A Technical Design Of One Supervision During Local Visions At The Bottom Of The Mine, Between From 7.00 To 13.00 On Business Days - After Prior Agreement 9. The Technical Design Should Be Transferred To The Ordering

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail