1) The Subject Of The Contract Is The Second Stage Of Work Consisting In The Modernization And Reconstruction Of The Interior Of The Facility By Separating A Place Of Care For Children Under 3 Years Of Age From The Pre-School Surface, In Which The Range Of Fire Installations, Renovation Of The Existing Staircase And Existing Rainwater Sewage And Sanitary Sewage Installation As Well As The Performance Of Work At The Object. From Conglomerate, Width Up To 30 Cm2. Floors- Reproduction Of Floor Layers In Rooms Where The Floor Has Been Shot3. Works Related To The Creation Of A Nursery4. Development- Construction Of A New Band Around The Building Along With The Construction Of Off-Road Stairs- Balustrades And Grilles. Roof- Demolition Of Floors On The Ceiling6. Construction Works- Widening The Holes In The Structural Walls Together With The Installation Of Steel Lintels- Widening The Holes In The Structural Walls- Widening The Holes In The Partition Walls- Installation Of The Smoke Exhaust Lid Of The Main Staircase7. Floors- Floors For A Nursery- Floors For The Common Part And Kindergarten8. Walls- Wall Finishing In The Nursery Rooms- Finishing Walls In Kindergarten Rooms9. Ceilings- Finishing Of The Ceilings In The Nursery Rooms- Finishing Of The Ceilings In The Kindergarten Rooms- Reconstruction Of The Ceiling In The Basement To Meet The Required Class Of Fire Resistance10. Woodwork And Internal Locksmith- Replacement Of Woodwork And Door Locksmith11. Installation Of A New Balustrade In The Main Staircase12. Roof- Roofing Renovation13. Equipment- Furnishing Part Of The Nursery- Equipment Of The Common Part For A Nursery And Kindergarten- Fire Protection Equipment- Kindergarten Equipment14. Sanitary Industry- Ventilation Installation: Supply Installation- Ventilation Grilles, Devices- Headquarters, Roof Fans, Basics- Water Supply Installation: Hydrant Installation, Living Installation- Internal Sewage System Installation- External Sewage System Installation- Sanitary Sewage System: Replacement Of Audit Wells And Sanitary Sewage System In The Field Of Plot (Study)- Rainwater Sewage System: Execution Of Connections And Collector For Rainwater From The Roof And Area Paved + Street Inlets15. Electrical Industry- Electrical And Teletechnical Boards- Internal Supply Lines, Wiring- Electrical Equipment: Sockets, Connectors- Basic Lighting- Emergency And Evacuation Lighting- Teletechnical Installations- Summoning Installation- Ssp Installation: External Lighting. In The Form Of 4 Lamps On The Facade Of The Building3) A Detailed Description Of The Investment Is Contained In The Design Documentation And Opz, Which States The Attachment To This Description Of The Subject Of The Contract. With This Fire Protection, With The Recommendation Of The Investor And To Give The Subject Of This Contract To The Ordering Party, Within The Period Agreed At It. 5) The Subject Of The Contract Must Be Carried Out In Accordance With The Provisions And Standards In Force At The D
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.