Existing Condition: The Office In The Area Covered By The Investment Has A Office And Economic Building. The Facilities With A Gravel Surface Width 3.0-4.50M, In Addition, A Pedestrian Pavement With A Concrete Surface Of 0.75M Is Brought To The Office Of The Office. The Remaining Investment Area Is Zieleniec. A Band Of Concrete Cubes With A Width Of 0.50-3.00M Is Made Around The Buildings. The Area Is Flat And Dehydrates On The Existing Surface Drops. The Planned Investment Is Within The Range Of The Jaśliskie Landscape Park And The Area Of Special Protection For The Natura 2000 Beskids Low Beskids. For The Investment In Question, An Effective Notification Of Construction Works Was Obtained. The Designed Condition: The Investment Concerns The Hardening Of The Area At The Kancelary.Pl Building, The Works Will Be Carried Out Entirely Within The Boundaries Of Plot No. 795/1 - Use B. As Part Of The Task, The Cubes Around The Office Of The Office And The Outbuilding Will Be Made. A Ramp For Disabled People Was Designed At The Main Entrance To The Office. Existing Gaits Will Be Renovated On Both Sides Of The Building. The Works Will Not Go Beyond The Indicated Range. Surface Installation: Maneuvering Road Made Of Concrete Cubes - 210.0 M2 Parking Municipalities Made Of Concrete Cubes - 177.0 M2chig, Bands - 164.0 M2 For Disabled People Along With Landing - 28.0M 79.0 Sq M Concrete Mustered-83.5 Concrete-119.0Mpalisada Concrete-25.0 Mpplameters: Group Of The Load Capacity Of The Ground Substrate-G3szerocity Of The Maneuvering Road-4.50-5.00Mteren Of The Investment Is Outside The Areas Of Endeavor. Simple Soil Conditions Occur On The Project. The Freezing Depth Is 1.20M. There Were No Adverse Phenomena That Could Affect The Ground. The Area Within The Investment Shows Features Enabling The Stability Of The Structure Of The Facilities. The Area Is Located Outside The Areas Of Mining Activities. The Groundwater Level Is Strongly Dependent On The Frequency Of Precipitation. During The Implementation, The Rainwater Should Be Protected And The Soil Must Not Be Moistened. Paying Attention To The Nature Of The Investment, The Occurrence Of Simple Land And The Type Of Planned Earthworks, The And The Geotechnical Category Of Land Is Adopted.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.