Chapter Iii Swz. Points 2 The Order Includes The Performance Of Works In Accordance With The Functional And Utility Program, Including: A) Development Of Project Documentation Referred To In Article 30 Of The Construction Law (Journal Of Laws. Roof For The Purposes Of Developing Project Documentation, C) Preparing Technical Expertise Or Technical Opinion, Confirming The Usefulness Of The Existing Roof Truss Structure For Further Operation (After Making Reinforcements / Improvements / Partial Replacement Of Elements) Or The Need To Complete The Prison For A New One, D) Preparing On Behalf Of The Contracting Authority Of All Documents Referred To In Article 30 Of The Construction Law (Journal Of Laws 2025.418, I.E. Of 2025.04.01), To The Extent Necessary To Accept The Notification For Construction Works, E) Submission (On Behalf Of The Ordering Party) To The Municipal Office In Zabrze (Construction Department) Of The Application For Submitting Construction Works, Based On Article 29 Para. 3 Point 2) Item B) Of The Construction Law (Journal Of Laws 20125.418, I.E. 2025.04.01), F) Execution Of Dismantling/Demolition Works Of The Existing Roof, Assembly Works Of The Elements Of A New Roof, Finishing Works Accompanying The Construction Of A New Roof. In Relation To Art. 29 Para. 3 Point 2) Item B) Of The Construction Law (Journal Of Laws 20125.418, I.E. Of 2025.04.01), The Contracting Authority Provides For The Need To Submit Construction Works. A Detailed Description Of The Subject Of The Contract - Functional And Utility Program Is Annex 3 To Swz3. The Subject Of The Contract Should Be Completed In Accordance With: A) The Act Of 07.07.1994. Construction Law (I.E. Journal Of Laws Of 2025, Item 418) B) By Act Of 16.04.2004. On Construction Products (I.E. Journal Of Laws Of 2021, Item 1213, As Amended). C) Regulation Of The Minister Of Labor And Social Policy Of 26.09.1997. On General Occupational Health And Safety Regulations (I.E., Journal Of Laws Of 2003, No. 169 Item 1650, As Amended); D) Other Laws And Ordinances That Apply To The Subject Of The Contract, Polish Standards And The Principles Of Technical Knowledge And Building Art; E) The Conditions Set Out In The Specification Of The Terms Of The Contract. 5 Requirements Of The Ordering Party1) The Contracting Authority Informs About The Possibility Of Making A Local Vision, Which Is Determined As At 10.07.2025. At 12: 002) The Scope Of Construction Works For The Execution Of The Contracting Authority In Annex 3 To Swz3) The Subject Of The Contract Should Be Carried Out In Accordance With Applicable Regulations, Standards, The Principles Of The Best Technical Knowledge And Building Art, And With The Principle Of Due Diligence Of The Contractor. Hygiene If The Product Requires It. Each Change Of Materials Requires The Consent Of The Supervision Inspector. Association In The Civil Engineering Chamber (Current Fee). Building Qualifications For Design Without Restrictions In The Construction And Constr
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.