Tenders Are Invited For The Creation Of The Social Activity Center In Świdnik As A Place Of Support And Activity For People And Groups Of Residents Excluded Or Threatened By Social Exclusion
Tenders Are Invited For The Creation Of The Social Activity Center In Świdnik As A Place Of Support And Activity For People And Groups Of Residents Excluded Or Threatened By Social Exclusion
1. The Subject Of The Contract Is The Implementation Of The Task Entitled To The Social Activity Center In Świdnik As A Place Of Support And Activity For People And Groups Of Residents With Excluded Or Threatened By Social Exclusion. 2. The Scope Of The Subject Of The Contract Is Illustrated By The Design Documentation And Includes: A) Demolition Of The Existing Building On Journal Of Laws No. 2007 Together With The Utilization Of The Resulting Waste; B) Demolition Of Existing Hardening Along With The Utilization Of The Waste; C) Cutting Of Trees On Journal Of Laws No. 2008, 2006; D) Construction Of The Social Activity Center; E) Construction Of External Stairs; F) Construction 2006; H) Small Architecture Objects; I) External Installations And Connections: Water Supply, Sanitary Sewage, Rainwater Drainage, Electricity And Other, J) Preparing The Area For Construction, Including: Demolition Not Included In The List With Utilization, Cutting Down Trees And Shrubs, Photo Of A Layer Of Fertile Soil, Profiling Area, Earthworks. In Connection With The Preparation Of The Construction Site, Existing Facilities, Soil And Water Conditions Of The Substrate, And Existing Networks Running In The Field, K) Collision, L) Construction Works Based On Design Documentation, M) Profiling Of Green Areas, Profiling Of Green Areas, Plating Lawn And Planting In Areas Covered By Construction Works And Construction Impact, And Construction Works, And Construction Works Not Necessary For The Proper Functioning Of The Buildings Being Built, O) Performing Vertical, Horizontal And Motion Safety Devices Along With The Preparation Of A Permanent And Temporary Traffic Organization (If Required), P) Execution And Delivery Of As -Built Drawings And Geodetic As -Built Measurements, Q) Execution Of The Energy Certificate Of The Built Object, R) Obtaining, On Behalf Of The Contracting Authority, Permission To Use Opposition To The Accession Of Use Issued By The Poviat Building Supervision Inspector, P.) Preparation Of As -Built Documentation In The 2Egz Paper Version. And Identical To The Paper Version Of 1Egz., T) Execution Of A Nature Inventory Before Joining The Works Confirmed By A Report Prepared By A Specialist And A Protocol Signed By The Construction Manager As Part Of The Preparation Of The Investment Area For Conducting Construction Works And Other Works, Taking Into Account The Protection Of Birds And Other Legally Protected Animals, In Accordance With Article 52 Of The Act Of April 16, 2004. On Nature Protection (Journal Of Laws Of 2023, Item 1336, As Amended) And §6 Of The Regulation Of The Minister Of The Environment Of December 16, 2016. On The Protection Of Animal Species (Journal Of Laws Of 2022, Item 2380Tj) 3. In The Field Of Geodetic As -Built Measurements Referred To In Point 2 Lit. P) The Contractor Is Obliged In Particular To The Following: A) The Performance And Delivery Of Geodetic As -Built Measurements (Inventory) With The Statement Of The Poviat Eldership
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.