1. The Subject Of The Contract Is The Implementation Of The Task Called: Modernization Of The Sewage Treatment Plant In Kunów The Contractor Must Provide For All Circumstances That May Affect The Price For The Performance Of The Subject Of The Contract. The Bill Of Quantities Is Only An Auxiliary Material, The Contractor Cannot Estimate The Value Of The Contract Only On Its Basis. The Contracting Authority Recommends Making A Local Vision At The Place Of Implementation Of The Task. 2. The Contracting Authority After Making A Detailed Analysis Withdraws From The Requirement To Take Into Account The Requirements In The Scope Of Availability For Disabled People And Design For All Users, Because Pursuant To Art. 100 Para. 1 Of The Public Procurement Law, This Is Justified By The Nature Of The Subject Of The Contract. The Modernization Of A Sewage Treatment Plant Is A Task For A Common Infrastructure, Serving The Entire Community From The Kunów Commune. The Sewage Treatment Plant, As An Object, I.E. A Set Of Technological Equipment And Facilities As Well As Accompanying Facilities (Necessary To Provide Energy, To Create Appropriate Operating Conditions For Service, Course, Management And Control Of Technological Processes) For Removing Pollution Contained In Sewage, Is Not A Place Available To The General Public, Nevertheless, It Is A Strategic Object And Is A Critical Infrastructure, Which Directly Improves The Comfort Of Life. Residing In The Kunów Commune. 3. The Subject Of The Order Is The Reconstruction Of The Sewage Treatment Plant In Kunów As Part Of The Investment Task Under The Name: Modernization Of The Sewage Treatment Plant In Kunów Consisting In Changing The Technology Of Sewage Purification From Mbr (Membrane Biological Reactor), At Sbr (Sequance Biological Reactor). Place Of Implementation Of The Subject Of The Order: The Existing Sewage Treatment Plant Is Located On The Registration Plot Number 3886 Precinct 260705_4.0001 Kunów Code Unit - City [260705_4], Ostrowiec Poviat, Świętokrzyskie Voivodeship, Ul. Łąkowa 10, 27-415 Kunów. The Detailed Scope Of Construction Works Is Determined By: 1) The Architectural And Construction Design Under The Name: Reconstruction (Modernization) Of The Sewage Treatment Plant In Kunów-Change Of Sewage Treatment Technology From Mbr To Sbr; 2) Technical Design; 3) Technical Specifications For The Implementation And Acceptance Of Works; 4) A Predeependent Of Works, Which Is Only Auxiliary Material. The Contractor Is Obliged To Perform His Own Measurements And A Comprehensive Assessment Of The Scope Of Works Necessary To Carry Out The Entire Subject Of The Contract; 5) The Decision Of The Mayor Of The City And Commune Of Kunów. On December 14, 2012, On Waste (Journal Of Laws Of 2023, Item 1587, 1597,1688, 1852 And 2029 And From 2024, Items 1834, 1911 And 1914), With The Exception Of Materials And Devices From Dismantling: 1) Existing Foam Sieve In The Sewage Pump; 2) Air Supply System And Filtration In Heal
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.