2.3. Part I - Thermomodernization Works2.3.1. The Purpose Of Thermomodernization Works Of The Building, The Purpose Of Planned Construction And Installation Works Is To Thermo-Modernization Of The Building (Renovation Of The Existing Insulation Layer) In Order To Improve Its Technical Parameters In The Field Of Thermal Insulation Of The Building Partitions, Replacement Of Damaged Finishing Elements Of The Facade From Concrete Plates And Metal Grid. Along With The Planned Thermo-Modernization Works, Renovation Works Related To Ventilation Chimneys On The Roof Slope Are Also Planned. In Addition, As Part Of Construction Works, It Is Planned To Make Two Door Openings On The First And Second Floor Of The Building To The Rooms Of The Classroom Facilities Along With The Processing Of Holes And The Installation Of Door Joinery With Increased Strength To Ensure Access To Rooms From General Communication And Exchange Of Rooms For Rooms For Teaching Offices And Administrative Offices. 2.3.2. Material Scope Of The Building Thermo -Modernization Works: • Preparatory And Demolition Works, • Disassembly Of Facade Concrete Plates Mounted On The Steel Grate To The Building Facade Due To Their Damage Together With A Layer Of Thermal Insulation, • Dismantling Of Roofing Machining, Lighting Fittings And Other Devices Placed On The Building Facade, • Installation Of Thermal Insulation With Mineral Wool With Mineral Wool Together With A Thin -Layer Plastering Expedition And Assembly Of External Window Sills And Roofing Machining. • Re-Installation Of Lighting Fittings And Devices Located On The Building Facade, • Painting The Facade Of The Old Part Of The School By Making It, Complementing Missing Plastering Or Damaged Plastering Expeditions And New Painting Coatings, • Performing New Horizontal And Vertical Painting Coatings, • Renovation Of Ventilation Chimneys Above The Roof Connection By Supplementing Cem.-Wap Plasters. Performing New Roofing And Asphalt Roofing Isolation, 2.3.3. Material Scope Of Construction Works Execution Of Two Door Openings: • Forging Holes For Doors In The Walls Of Building Brick Thickness 1 And More Brick. On Lime Mortar Or Cem.- Wap. Execution Of Overflowing Holes In Brick Walls With Forging Nests For Beams - Prefabricated Door Lintels. • Making The Internal Plasters Of Ordinary Category Iii From Cement Mortar On Flat Walls. • Single -Layer Plaster Coats On Walls And Ceilings - Two Layers. Colors To Be Agreed With The Manager Of The Object Colors To Be Agreed With The Ordering Party. Vertical Edges Of The Door Leaf Secured With A Steel Profile. 4Th Class Of Mechanical Resistance, Conditions Of Use - 7Th Grade, Category Of Use Conditions - 4Th Grade. • Supplementing Defects In The Doorstep - Aso -Fs10 Self -Leveling Spout With 30 Mm Thick On Anhydrite Substrates In Rooms Where The Floor Was Broken. Ceramic Tiles With Dimensions Of Min. 40 X 40 Cm, Arranged Using The Ordinary Method In Light Shades. Colors To Be Agreed With The Manager Of
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.