Quotation Are Invited For Renovation Of Warsan Admin - 2F Ii & P Dept

Tender Detail

98889339
2332501659
Self-Funded
Quotation Are Invited For Renovation Of Warsan Admin - 2F Ii & P Dept
NCB
Asia
Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
09-07-2025

Work Detail

Quotation are invited for Renovation of Warsan Admin - 2F II & P Dept. 1.00#PRELIMINARIES###1.1# THE CONTRACTOR IS TO NOTE THAT QUANTITIES HAVE BEEN MEASURED TO THE NEAREST SQUARE OR LINEAR METER AND HE IS TO VERIFY THE QUANTITIESREQUIRED TO CARRY OUT THE WORKS IN FULL. NO CLAIM FOR ADDITIONAL COSTSWILL BE ALLOWED AT LATER STAGE OF C ONSTRUCTION ON THE BASIS OF INCORRECTQUANTITIES. #NOTE#1.2#THE CONTRACTOR IS TO ALLOW FOR PROTECTING THE WORK AS IT PROCEEDSALLOWING FOR REGULAR CLEANING, DISPOSAL, STORAGE AND TRANSPORT OFMATERIALS TO SITE. THE SITE SHALL BE KEPT SAFE AND SECURE ALL THE TIMES.THE CONTRACTOR SHALL INCLUDE HERE OR IN HIS RATES FOR ALL NECESSARYPLANT, SMALL TOOLS, ETC. FOR THE EXECUTION OF THE WORKS IN FULL.#NOT E#1.3#THE BIDDER SHALL INCLUDE 3D RENDERS FOLLOWING THE DESIGN CONCEPTPROVIDED, WHICH SHOWS THE DIFFERENT VIEWS OF THE PROPOSAL, COL ORCOMBINATION, LIGHTING ARRANGEMENT, PERSPECTIVE DESIGN ETC. DURING THETENDER STAGE. THE BIDDER IS FREE TO SUBMIT ADDITIONAL OWN D ESIGNOPTION.#ITEM#1.4#THE CONTRACTOR SHALL ALLOW FOR PREPARATION OF SHOP DRAWINGS,MATERIAL SUBMITTALS AND AS BUILT DRAWINGS. #ITEM#I )#THE SHOP DRAWINGS AND MATERIAL SUBMITTALS#NOTE###THE CONTRACTOR SHALL ALLOW FOR PREPARATION OF SHOP DRAWINGS ANDMATERIAL SUBMITTAL S. THE SHOP DRAWINGS AND MATERIAL SUBMITTALS SHALL BESUBMITTED FOR ENGINEERS APPROVAL PRIOR TO THE EXECUTION OF WORKS ATSITE AND WI THIN (2) WEXS FROM THE DATE OF AWARD OF CONTRACT.#####MEP MATERIAL SUBMITTAL FOR APPROVAL.THE FOLLOWING MATERIALS SHOULD BE SUBMITTE D TO X ENGINEER FOR APPROVAL.1. FIRE ALARM CABLE.2. ELECTRICAL CABLE AND WIRES.3 ELECTRICAL SWITCHES AND SOCKETS.4. LIGHTS5. AC SYS TEM COPPER PIPE INSULATIONS.6. AC SYSTEM DUCT INSULATION.7. SACS LOCKS###II)#AS BUILT DRAWINGS#NOTE### THE AS-BUILT DRAWINGS FOR ALL THE SERVICES SHALL BE SUBMITTED WITHIN14 DAYS OF COMPLETION OF THE PROJECT.#####1 SET OF SOFT COPY FOR ALL AS BUILT DRAWINGS#####EQ UIPMENT LIST TO BE SUBMITTED###III)#PREPARATION OF DRAWINGS AND DOCUMENTATION SHALL BE AS FOLLOWS, #NOTE###A. ALL ARCHITECTURAL DRAW INGS & DETAIL DRAWINGS OF THE PARTITIONLAYOUT, CEILING DETAILS, JOINERY WORKS # CABINETS, LOCKERS, PANTRY, ETC.#####B. HVAC SHOP DR AWINGS TO INCLUDE AIR FLOW RATES FOR EACH DIFFUSER INCFM, HEAT LOAD CALCULATIONS, DUCTING LAYOUT, THERMOSTAT LOCATIONS,POSITIONING A ND SIZING OF SUPPLY AND RETURN AIR GRILLES GAS & LIQUIDPIPE LAYOUT, EXTERNAL UNIT LOCATIONS.#####THE TENDERER TO VISIT THE SITE AND CHECK THOROUGHLY TO IDENTIFY THEAMOUNT OF WORK NEEDED AND TO SUBMIT DETAIL DRAWINGS FOR THE CEILING,HVAC, LIGHTING, SMALL POWER, FI RE ALARM, FIREFIGHTING & LV SYSTEMSINCLUDING IT DRAWINGS FOR DEWA ENGINEER APPROVAL.#####C. ELECTRICAL DRAWINGS TO INCLUDE ALL LIGH TING, SMALL POWER AND LVSYSTEMS WITH CIRCUIT DETAILS. SHOW MAIN CABLE ENTRIES AND ROUTES TO THEDBS AND DISTRIBUTION. #####D. PREPARE ELECTRICAL LOAD SCHEDULES FOR ALL CONNECTED NEW LOADS ASPER NEW SMALL POWER, LIGHTING AND A.C., REQUIREMENTS SHOWN ON THEDRAWINGS. SLD NEEDS TO BE PREPARED AND SUBMITTED.#####PREPARE LOAD DISTRIBUTION SCHEDULES FOR ALL POWER & LIGHTING DBS.LOCAL POWER AUTHORITY APPROVALS TO BE TAKEN IF NECESSARY.#####E. PREPARE FIRE ALARM, FIRE FIGHTING DRAWINGS AS PER THE LOCALREGULATIONS.#####F. PREPARE TH E EMERGENCY LIGHTING CIRCUIT LAYOUT AND EMERGENCYEVACUATION PLAN WITH PROPER EXIT SIGNS LIGHTS LAYOUT.#####G. MATERIAL SAMPLES AND S UBMISSIONS FOR APPROVALS TO BE FORMALIZEDTHROUGH #MATERIAL APPROVAL REQUEST SHEETS#.#####H. TESTING & COMMISSIONING OF ALL INSTALLED MEP SERVICES & ENSURESUBMITTALS OF TEST SHEETS FOR THE SAME. #####I. OPERATIONAL & MAINTENANCE MANUALS AND AS BUILT DRAWINGS. ALL OWFOR 2 COPIES OF OPERATIONAL & MAINTENANCE MANUALS (THE FORMAT OF THEMANUAL TO BE AGREED WITH THE CLIENT) ALLOW ALSO FOR WARRANTIES ANDGUARANTEES FOR ALL EQUIPMENT AND FIXTURES INSTALLED AND SERVICESRENDERED. (SOFT & HARD COPIES)#####J. ALL THE MATERIALS PROPOSED FOR THIS PROJECT SHALL BE SUBMITTED FORENGINEERS APPROVAL. MINIMUM OF TWO COPIES OF SUBMITTALS ARE REQUIRED FOREACH MATERIAL WITH P ROPER MATERIAL APPROVAL FORMS#####K. TESTING & COMMISSIONING OF ALL INSTALLED MEP SERVICES & ENSURESUBMITTALS OF TEST SHEETS FOR TH E SAME. Qty: 1 RENOVATION OF WARSAN ADMIN - 2F II & P DEPT Site Visit 07.07.2025 at 10.00 am Contact Rawdha 0566969696 STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332501659)/$value

Key Value

Tender Value
Refer document

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail