At The Defense Location Fort Harssens 09D04 There Is A Marina Between Steiger 1 And 2, This Marina Was Constructed In 1998 And Has The Main Users The Kmjc, The Port Service Of The Czsk And The Knrm. The Current Floating Infrastructure Between Steiger 1 And 2 Was Dated In 1998 And The Technical Lifespan Has Elapsed. In Recent Years, The Costs For (Regular) Maintenance On The (Wooden) Scaffolding And (Steel) Tubular Piles Have Risen Significantly. Partly Because Of This, Cost -Efficient Management Is No Longer Possible. In Addition, The Electrical And Mechanical Installations On The Scaffolding No Longer Meet Current Standards. Defense Decided At The End Of 2022 To Replace The Floating Infrastructure And To Realize The Central Government Real Estate Agency. For This Registration Phase Of The Request, The Vo Is Included Including The Essential Matters In Part I And Iii Of The Raw Specifications. The Implementation Drawings And The Full Specifications Will Be Published At The Start Of The Registration Phase. The Scope Of The Assignment Consists Of Outline: - Removing/Replacing Cables And Pipes - Removing/Replaced Floating Scaffolding - Removing/Replacing Steel Tubular Piles - Dredging
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.