Supply Of Evaporing Unit And Split Type Air Condensing Unit Hi -Wall (Wall) Of 12,000 Btu´S 220V - Cold Cycle - Classification A (Procel Seal). Evaporator And Condensing Unit Of Split Inverter Type Air Conditioning Floor Ceiling Of 36,000 Btus 220V - Hot/Cold Cycle Energy Classification A Or B (Procel Seal)., Providing Evaporating Unit And Split Air Condensing Unit Inverter Floor Ceiling 48,000 Btus 220V Tymphasic - Hot/Cold Energy Classification A Or B (Seal). Demolition Of Masonry, 07/04/2025 - 15:49:28, 04/07/2025 - 15:49:20, 04/07/2025 - 15:49:25, 04/07/2025 - 15:31, 04/07/2025 - 15:49:30, Granilite Floor Demolition, Cemented Floor Demolition Including Rubber, Ceramic -Coated Floor Demolition Including Concrete Ballast, Old Pva Painting Wall Sanding To Receive New Paint Layer, Removal Of Metal Tile, Exclusive Structure, Metallic Roof Structure, Removal Of Metal Structure, Manual Masonry Hole, For General Installations, Greater Than 40 Mm Or Equal To 75 Mm. Mechanized In Concrete, With Demolishing Hammer, Disassembly And Removal Of Measurement Board, Careful Removal Of Existing Lamp And Reinstallation, Removal Of Refrigerated Air Box, Concrete, Temporary Installation Of Water Supply For Measuring, Temporary Installation Of Electricity For The Work, Including Cash Supply For Polyphant Meter And Breaker, Pmv Standard Workplate, Dimensions Of 2.0 4.0 M, Work Shed For Deposit Of Materials And Tools With A Minimum Area Of 6.00 M2, Of Resin Plywood 10 Mm And 6Mm Fiber Ceiling Tile Cover, Including Light Point, Construction And Demolition Of Ceiling And Upper Wall Coating, Wood Harpked 10 Times, Per M2 Of The Ceiling, Construction And Demolition Of Provisional Siding With 2.00M Height, Per Meter, Per Meter, Per Meter, Per Meter, Per Meter, Per Meter, Per Meter Galvalume 0, 50Mm White Steel Metallic Tile Shop H = 2, 20M, Inc. Mont. Estr. Mad. 8X8, With Pmv 60X60cm Adhesive Every 10M (5X Reuse), Orange Insulation Fences, H = 1.20M, Fixed On Wooden Tops And Concrete Base Every 3M (Considering 2 Uses), Metallic Scaffolding For Façade - Tower Type (Monthly Rent), Mounting And Dismantling Tower? Tubular Scaffolding 20 Times, Vertical Or Horizontal Platform Or Catwalk Movement, Monthly Lease Of Hydraulic Portable Bathroom For Construction Site Conf. Nr18, 24 And 31 - 03 Weekly Maintenance (Waterfall, Toilet With Discharge, Washbasin, Urinal, Toilet Paper, Towel And Liquid Soap, Cap. 600L, Interconnection System To The Public Sewage Network), Including Mobilization And Demobilization, Manual 1A Material. Category, Up To 1.50 M Depth, Manual Landfill To Regularize The Terrain In Clay, Including Manual Densification And Supply Of Material (Maximum Of 100M3), Rock Ditch, Using Expansive Mortar, Excluding