The Construction Of Individual Drinking Water Solutions Is Considered For The Collection And Disinfection Of The Vital Element For Human Consumption Through The Drilling Of Deep Wells Of 30 Meters, With An Accumulation Pond Elevated To 6 Meters. A Pumping Equipment Will Drive The Water To The Pond, Chlorination Is Included Through The Corresponding Team And From The Pond To The House The Water Arrives By Gravity To A Projected Garden Key
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.