Engineering Services - Herford Straße (Süd) - Planning Services Transport Facilities And Engineering Structures. The City Of Bielefeld Plans To Redesign Herford Straße Between Zimmerstraße And The City Limits (Overall Project). A First Section Of The Owl 2.0 Cycle Path Is To Be Realized, Which Creates An Important Connection From Rheda-Wiedenbrück Via Gütersloh And Bielefeld To Herford And Seamlessly Linked To The Rs 3 Cycle Path, Which Continues To Minden. Here The Services For Planning The Transport Facilities In The Southern Section (Talbrückenstraße To Zimmerstrasse) Are Advertised. Herford Straße Is Of Particular Importance In The Cycling Concepts Of The City Of Bielefeld And The Region. It Represents A Main Route Of Category 1 In The Municipal Cycling Concept And Is Part Of The Development Corridor Route Herford. It Is Also Classified In The Bicycle Traffic Concepts Of The Bielefeld Regiopol Region And The Owl Region With Network Category 1. The Feasibility Examination For The Owl 2.0 Cycle Path Has Shown That Herford Straße Is Part Of The Preferred Lines. With The Future Owl 2.0 Bike Fast Path, The Planning For Cycling 3 (Rs3) Is To Be Connected. All In All, A Cycle Fast Path From Minden Via Herford, Bielefeld, Gütersloh To Rheda-Wiedenbrück Is To Be Built. On The Route There Is Mixed Water Sewageization In The Inner City Area, Dirt And Rainwater Channels On The Rest Of The Route (Each In The Area Of The Light Railway Tracks). In Accordance With The Replacement Or Reorganization Requirement Of The Existing Sewage System (Hydraulics, Damage Classes, New Street Drainage Channels, Rainwater Treatment Before Initiation, Etc.), A Canal Planning Must Be Created. Detailed Further Description Can Be Found In The Document Information On The Object Of Performance.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.