Modernization Of The Tent Hall Heating System Together With The Adjacent Facilities In The Design And Build System. As Part Of This Stage, The Contractor Will Draw Up A Construction Project, Executive Design, Information On Safety And Health Protection, Hereinafter Referred To As Bioz, Works Of Works, Investor Cost Estimates, Technical Specifications For The Execution And Acceptance Of Construction Works, Hereinafter Referred To As Stwiorb. The Contractor Is Also Obliged To Obtain The Required Arrangements, Permits, Permits, Tests, Checks, Certificates, Opinions, Geotechnical Tests, If They Are Required At The Stage Of Preparing The Project And Submitting A Report Of Works Or Obtaining A Decision On The Building Permit And Transferring Copyright To The Contracting Authority. Implemented On The Basis Of Project Documentation Throughout The Entire Period Of Implementation Of Works, In Particular: Confirmation Of The Compliance Of The Implementation Of Construction Works With Project Documentation, Active Participation In Committees, Technical Meetings, Acceptance Of Works And At Each Call Of The Ordering Party With A Frequency Adapted To The Real Needs And Problems Reported By The Ordering Party. This Stage Also Includes: Arrangements Regarding The Possibility Of Introducing Replacement Solutions In Relation To Those Provided For In The Project Documentation, On Their Own Initiative In The Event Of An Error Or Inaccuracy In The Documentation Or After The Problem Is Reported By A Representative Of Either Party (Construction Manager, Work Manager, Investor Supervision Inspector, Participant In The Meeting) Together With The Cost Calculation Of This Solution And The Presentation For Acceptance By The Ordering Party. Construction - Execution Of Construction Works According To The Draft Documentation Drawn Up Referred To In Point 1), Accepted By The Ordering Party In Accordance With The Law, In Particular Construction Law, Enforcement Provisions And Other Related Provisions, Appropriate For The Implementation Of The Subject Of The Contract, Applicable Standards, Technical Conditions, Technical Knowledge Principles, Instructions Of The Ordering Party, Inspector Of Construction Supervision, Designer, A Designer, And Designer, And Designer And Designer Implementation Of As -Built Documentation Together With The Transfer To The Contracting Authority Of Copyright And Obtaining A Permit For Use, If Required. Detailed Information On The Opz And Its Scope As Well As The Method Of Implementation Is Included In This Specification Of The Terms Of The Contract Together With Attachments: 1) Annex 1 To Swz - Offer Form, 2) Annex 2 To Swz - Planned Provisions Of The Contract, 3) Annex 3 To Swz - Pfu4) Annex No. 4 To Swz - Statement From Art. 125 Para. 1 Pzp And Art. 7 Para. 1 Osr5) Annex 5 To Swz - Obligation Of The Entity Providing Resources - If Concerned, 6) Annex 6 To Swz - Statement Of Contractors Jointly Applying For The Order - If Concerned, 7) Annex 7 To Swz -