1. The Subject Of The Contract Is Modernization Of The Facility At The City Stadium, Including: Reconstruction Of Mechanical Ventilation And Sanitary Facilities And A Roof Renovation In A Sports Pavilion, As Well As Renovation Of The Sanitary Building At Ul. Kopalniana 4 In Polkowice, Plot Of Land 13/7, Precinct 2, Polkowice Commune, In The Scope, Among Others ::1.1.1. General Construction Industry - Main Building: A) Replacement Of Suspended Ceilings, Including: Dismantling Of All Suspended Ceilings From Plasterboard With Light Luminaires And Detectors (For Re -Assembly), Searches And Anesthetics, Installation Of Module, Acoustic And Waterproof Compositions - According To Design, Along With New Light Fixtures, Detectors, Searches And Anetostates. Ceilings And Lighting Fittings Adapted To Individual Rooms; B) Replacement Of Housings Made Of Plasterboard Sanitary Installations And Installation Furrows, Including: Dismantling Of Existing Enclosures, Making Furrows For Conducting New Installations, Assembly Of New Enclosures Made Of Waterproof Plates, Supplementing Plasters With Cement-Water Mixtures, They Stroke The Gypsum Walls Without Platelet Cladding; C) Replacement Of Wall And Floor Cladding Made Of Ceramic Tiles; D) Painting With Latex Paints Previously Cleaned And Primed Walls; E) Replacement Of Hpl Cabin Walls; F) Replacement Of Support Structure For Ventilation Center Building, Modernization Of The Installation Passages Through The Flat Roofs, Making A Plinth Cover From The Roof Membrane In The Place Of The Existing Ventilation Unit, Making Service Paths From The Anti -Slip Membrane, Rotation Of The Roof Hatch, Performing A New Support Structure For Ventilation Center And Freon Units From Rolled Shapes, Anti -Corrosive Protection Construction Of Painting Coatings; G) Roof Renovation, Including: Demolition Of The Existing Roofing From Roofing Felt Along With Sheet Metal Machining And Roof Inlets, As Well As Roof Insulation And Walls Above The Roof, Performing Vapor Barrier Insulation From Foil, The Thermal Insulation Of The Roof From The Foam Layer With A Thickness Of Min. 15 Cm, With The Creation Of The Trough And Drainage Declines, Installation Of New Roof Inlets With Connection, Insulation Of Walls With 15 Cm Foamed Polystyrene, Roofing Of Roofing With Roofing Felt, Renovation Of Roof Irradiation With Glazing And Sealing Elements; 1.1.2. Sanitary Industry - Main Building: A) Reconstruction Of Hot Water Installations, Cold Water And Circulation Installation, Including: Dismantling Of Existing Cables And Fittings In Renovated Rooms, Execution Of New Installations After The Existing Route And Assembly Of New Fittings In Renovated Rooms, Assembly Of New Installations In Room No. 023 (According To The Technical Design) Together With The Armature; B) Reconstruction Of The Sewage System, Including: Cleaning Installations Outside The Renovated Rooms And Sewage Risers, Dismantling Of The Existing In