1. The Subject Of The Contract Are Construction Works Involving The Renovation Of Part Of The Rooms Of The Tso Building In Brzezie, Located On Plots Marked In The Land Register No. 243, 244 Located In Msc. Brzezie. The Existing Building Is A Public Building, A Two -Story, Non -Basement, Made In Traditional Technology. At Present, The Building Has An Electrical Installation, Central Heating, Gas And Water- Can. The Scope Of Renovation Includes: Room 10 - Garage (Lowering The Floor Approx. 20Cm: Forms The Existing. Making New Layers Of The Foundation, Dehydration With The Outside To The Outside, Making An Industrial Floor, Demolition Of The Wall 21Cm, Embedding Ipe 200 X 2, Exhaust Outfit, Plastering, Painting, Lighting, Gate Transformation, Door Replacement, Door Replacement Between 10 And 9, Removal Of Gate, Removal The Suspended Ceiling In The Part Between The Demolished Wall And The Outer Wall). Moresting 9 - Boiler Room - Cloakroom (Forms Of Existing Tiles, Laying New Floor Tiles Or Industrial Floors, Demolition Of The Wall, 19Cm And 15Cm, Execution Of New Brick Walls 12Cm, Plastering, Painting, Lighting, Door Installation 2 Pcs. New From G-K Plates). Moczing 5 And 6-Toilet With Vestibule (Disassembly Of The Urinal, Movement Of The Washbasin, Attachment To The Washing Machine, Plastering, Painting, Lighting, Cutting And Laying Tiles On The Floor And Walls, Replacement Of The Fittings With A New One). Moresting 1-Lighting (Skine Of Existing Tiles, Placing New Floor Plates, Plaster Repair Works, Repair Works Painting, Lighting, Disassembly Of A Suspended Ceiling And Making A New G-K Plates). In Addition To The Outside-Lowering The Ankle At The Entrance To The Garage Max. 10Cm At A Length Of 5.0M, Execution Of The Basin In The Green Area To Stop The Output Of The Led Out Of The Output. Works: Demolition Works Of Partition Walls On The Ground Floor, Execution Of Partition Walls On The Ground Floor, Embedding Steel Lintel, Installation Robots, Finishing Works. Failure To Do. Implementation: Renovation Of The Garage Room And Then Other Rooms. 2. The Subject Of The Contract And Qualitative Standards Are Specified In Detail In The Design Documentation, Technical Specification Of The Execution And Acceptance Of Works (Stwior) And Bill Of Quantities. They Constitute An Integral Part Of This Swz.3. Works Covered By The Subject Of The Contract Should Be Carried Out In Accordance With The Project Documentation And The Conditions Contained In Swz, The Model Of The Contract And With Applicable Regulations, Standards And Principles Of Technical Knowledge And Building Art, Due Diligence In Their Performance, Security, Good Quality And Proper Organization. 4. The Contracting Authority Requires A Local Vision Within The Subject Of The Contract For Contractors Interested In Submitting An Offer. The Local Vision Is Aimed At Familiarizing The Contractor With The Specificity Of The Subject Of The Contract, Including The Conditions Of Its Performance. The Number Of L