Osp Zawadka: A) Building Thermo -Modernization: • Insulation Of External Walls And Ceiling, • Lengthening The Roof Beyond The Insulation Layer, • Modernization Of The Hot Water System, • Modernization Of The Heating System, • Pv Installation, • Window And Door Replacement, • Installation Of External Blinds, • Monitoring Of Electricity And Heat Consumption, • Installation, • Installation, • Installation, • Installation, • Installation Air Conditioners, • Building Thermovision In Accordance With Iso18436, • Energy Consumption Management System In A Building Controlled By Plc, • Modernization Of Led Lighting, • Installation Of The Bank Of Energy, B) Ensuring The Availability Of A Building For People With Disabilities: • Creation Of 1 Parking Space For Disabled People, Together With The Access Pavement, • Construction Works Rooms That Will Meet The Requirements Of Availability (Transfer Of Water And Sewage Installations, Purchase And Assembly Of Doors, Interior Finishing, Equipment Installation), • Replacement Of The Door Inside The Building That Meets Accessibility Standards, • Purchase And Assembly Of Mat/Tiles Of Fon Before And Behind The Entrance To The Building, • Finishing Works After Adjustable Construction Works To The Needs Of Tzn, Reduction Of Contacts, • Painting Rooms, • Painting Rooms,
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.