Part 1 Of The Procedure - Purchase And Delivery Of It Equipment With Licenses 1) Ups To Workstations Pcs. 672) Ups To Workstations In Organizational Units Pcs. 133) Us Pcs. 24) Extension Of The Device Of Us Pcs. 45) Monitoring Server Pcs. 16) Server Pcs. 19) Utm Pcs. 210) Edr Software Ensuring An Adequate Level Of Data Security Is To Be: • Fips Certification 140-2 Level 3-Security Module • Technical Documentation Confirming The Fulfillment Of The Standard Standard Or Statement Of The Server Manufacturer On The Fulfillment Of The Standard-The Server Must Meet The Requirements Of The Nist Sp 800-193 Protection Against Cyber Attacks. Confirming Documents. The Contractor Will Provide The Above -Mentioned Documents Before Signing The Contract. The Equipment Should Be Delivered To The Poviat Eldership In Gostynin During The Offices Working Hours. Additional Information For Parts 1 And Part 2: The Software Must Be New, Unused, Previously Unscrewed On Another Device, Supplied In The Latest Stable Version From The Official Distribution Channel Of The Software Manufacturer Third. The Supplied Software And All Its Media (If They Occur) Must Be Free From Physical And Legal Defects. The Equipment Must Come From Production From 2024 Or 2025. Equipment Produced Earlier Will Not Be Allowed. The Equipment Must Be Brand New, Unused, Unregenerated, Complete, Supplied In The Original Packaging (The Packaging Must Be Intact And Have The Protection Used By The Manufacturer). The Equipment Must Be Free From Any Physical And Legal Defects, Technically Efficient And Must Come From An Authorized Distribution Channel. It Is Not Allowed To Use The So -Called Refurbished Devices, The Employer Reserves The Right To Verify The Originality Of The Provided Programs At The Manufacturer In The Event Of Doubts As To His Legality. In The Event Of The Non -Compliance Of The Contractors Declaration With The Opinion Of The Manufacturer, The Contracting Authority Will Refuse To Receive The Subject Of The Contract As Incompatible With The Specification Of The Terms Of The Contract. 4. Warranty (G) - The Length Of The Quality Guarantee Of The Contractor Provides Warranty (G) - Length Of The Quality Guarantee Period In Part 1 Of The Procedure For A Period Of Minimum 36 Months From The Date Of Signing The Acceptance Report, A Maximum Of 60 Months From The Date Of Signing The Acceptance Report. (Criterion For Evaluation Of Offers In Part 1 Of The Procedure). For Part 1 Of The Procedure, The Quality Guarantee Bid Evaluation Criterion Applies Only To The Extension Of The Manufacturers Warranty In The Items: Nas, Server, Device For Storage Of Backup Data. Criterion For Evaluation Of Offers Quality Guarantee Does Not Apply To Other Items From Part 1 Of The Procedure, I.E. -Ups To Workstations, -Ups To Workstations In Organizational Units, -Construction Of The Device Nas, -Monitoring Session, -Reducing, Installation And Configuration Of The Server, -Utm, -Edi Programming, -Portable Spots Encrypte
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.