In The 1St Ba, The Expansion Structure Is Built In The Wannenbach (As A Provisional) In The Area Of The Fischertalweg. Because Of The Existing, Crossing Mixed Water Sewer And The Space Ratios Very Cramped There, It Is Manufactured As A Ducker In The Tunneling Process. Specifically, This 1. Ba Includes The Following Individual Measures:
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.