Construction Of A Large-Grained Eu-Grain-Grain-Grain-Growing Thickness Thickness Of 4 Cm Thick, Density Of Stone Materials: 2, 5-2.9 T / M3 (Multi-Grained Asphalt Covering H = 5Sm), Ozboshabal Car, 20 T Transportation Distance - 5 Km. 1St-Grade Load, Construction Of A Thick-Skinned Boiling-Grower-Grower-Growing Boiling Thickness Of 4 Cm Thick, Density Of Stone Materials: 2.5-2.9 T / M3 (Multiplication Of Small-Grained Asphalt Covers H = 3Sm), Preparation Of Bitum Emulli, Natural Sand-Gravel Mix, Setting Up The Grounds Of The Grounds And Smoothing Layers: Sand-Gravel Mixture, Large Sand (Sand-Gravel Correction Of A Blend Of Sand-Gravel H = 10 Cm), Planning Plans, Power Of Bulldozers: 59 (80) Kw (A.G.)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.