The Subject Of The Contract Includes The Implementation Of Multi -Branch Design Documentation In Accordance With The Requirements Of Bep (Bim) Reconstruction Of The Building At Ul. Hubala 28 In Polkowice (High Building In The Wbl System) In Order To Obtain Full -Standard Apartments And Strengthen The Building On Mining Operation, Including From: 1) Execution Of Two Design Concepts Of Planned Reconstruction, 2) Implementation Of A Construction Project Together With Final Building Permit, 3) Implementation Of Technical And Executive Projects In All Industries, 4) Implementation Of The Specifications And Receipt Of Construction Works In All Industries, 5) Performing All Additional Design Studies Necessary For Comprehensive Implementation Of Construction Works, 6) Authors Supervision At The Stage Of Tender Procedure Granting A Public Procurement When Choosing A Contractor For Construction Works And At The Stage Of Construction Works As Part Of The Investment Task. The Contract Of The Contract Includes Four Stages, Which Were Described In § 2 Of The Draft Contract. The Contractor Should Also Have Disposal Of Persons Checking Individual Industries. The Detachment Description Of The Subject Of The Contract, Implementation Conditions, Payment Methods, Etc. Are Specified In The Attached No. 9 To Swz And In The Technical Documentation Constituting Annex 12 To Swz.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.