5.1. The Subject Of The Contract Is The Performance In The Formula Design And Build On The Attitude Of The Functional And Use Program Of The Investment Entitled: Design And Performance Of Two Noticeable Fire Protection In Wolski Bór And Karczmiska Forestry, Including In Particular The Implementation Of Design Documentation And Construction Works Together With Land Development, Until The Use Of Such Obligation) Authors Supervision As Well As The Supply And Assembly Of Specialized Devices, Intended For Ground Observation Of Forest Areas And Location Of Forest Fires. 5.2. The Design And Scoping Documentation Should Take Into Account The Equipment Of The Alarm Point (Pad) At The Headquarters Of The Kraśnik Forest District, And If Necessary, Resulting From The Operation Of The Fire Detection System, Designing An Additional Mast For The Purposes Of Ensuring Communication In The Designed System, Located At The Building Of The Forest District Office. 5.4. A Detailed Description Of The Subject Of The Contract And The Requirements Of The Ordering Party Regarding The Method Of Its Implementation Were Included In The Tender Documentation, In Particular In Annex 1 To Swz, The Functional And Utility Program (Pfu). 5.5. The Subject Of The Contract Will Be Carried Out In Four Stages. 5.5.1. The Stage Of Conducting A Visual And Radiocommunication Study Between The Indicated In Point 5.3. Above Locations (Seeing No. 2 - Seeing No. 1 - Pad), Among Others Determining The Exact Location And The Required Height Of The Designed Noticeable Stations That Will Be Used To Install Distant Range Cameras And As Antenna Media To The Transmission Of The Video Signal. Stage I Includes: 1. Presenting At Least Two Variants Of The Design Concepts Of The Fire Detection System In The Kraśnik Forest District Containing Estimated Investor Cost Estimates. Variants Must Be Presented In Particular By Two Types Of Perceptives. The Concepts (Both Variants) Should Be Presented In The Form Of Two Studies Describing Individual Elements Of The System And Their Parameters As Well As How The System Works Based On The Adopted System Elements And Technologies. Estimated Estimated Cost Assumptions Of The Implementation Of Construction And Assembly Works Of Individual Variants Must Be Drawn Up For Each Variant Of The Concept. The 2Nd Variants Of The Concept Submitted To The Employer Will Be The Subject Of Analysis And Arrangements With The Contractor, And Then The Employer Will Choose One Concept Variant For Further Development. 2 Stage Istiving Project And Complace Documentation At A Greating Conductive Decisions Of The Building, Excluded And Modernization Of The Fight Construction System In The Kraśnik Forest District By Building Two Fire Visits Intended For Detecting Fires In Forest Areas, Equipped With Fire Detection Equipment Using A Wireless Communication System. Stage Ii Includes The Following Tasks: 1. Execution In The Full And Comprehensive Scope Of Design And Cost Documentation Of Cable Pow
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.