1. The Subject Of The Contract Is To Design And Perform The Task: Adapting The Building Of The Primary School In Jaraczewo For People With Special Needs. The Operational Price Of The Investment Is Improving Equal Access To High Quality Education, Training And Learning Throughout Life Through Supporting Educational Infrastructure Implemented In The Building Of The Primary School In Jaraczewo Through: • Construction Of External Infrastructure Providing Access To People With Disabilities, Interior Of The School Building For The Needs Of People With Disabilities, • Purchase And Assembly Of Facility Equipment With Didactic Equipment To Facilitate Work With People With Disabilities. The Order Of The Contract Includes In Particular: • Exercise Of A Detailed Inventory Of The Renovated And Rebuilt Rooms In The Building, • Implementation Of A Detailed Technical Expertise Of The Building In The Field Of Reconstructed Rooms, • Implementation Of The Architectural And Construction Design With All Arrangements, • Execution Of A Full -Time Technical Design For The Design Phase And Reflecting The Condition Of The Building At The Time Of Completion Of The Works, • Execution Of Offer Cost Estimates Together With The Technical Specification And Acceptance Of Works, • Preparatory Work Of The Construction Site, • Performing The Function Of Authors Supervision Throughout The Duration Of The Investment, • Obtaining All Consents, Opinions, Arrangements, Permits, Decisions, Etc. Conservation, • Providing The Construction Manager And Works Managers Enabling The Law In The Specialties:- Construction And Construction,- Installation In The Field Of Networks, Installations And Heating, Ventilation, Gas, Water And Sewage Systems,- Installation In The Scope Of Networks, Installations And Electrical And Electrical Equipment, • Execution Of Construction Works In Accordance With The Subject Of The Contract, Projects And Provisions And Provisions And Provisions Of Law, And Provisions And Provisions Supervision Inspector, • Organizing The Construction Site And Bringing The Original Areas To The Actor, • Execution Of As -Built Design Documentation, • Execution Of As -Built Documentation (Among Others Geodetic Inventory, • Obtaining All Consents, Opinions, Expertise, Decisions, Etc. Necessary To Obtain A Decision Of The Use Permit (If Required) And Safe Use Of The Facility, • Start Of All Facility Devices, • Conducting Training Of Facility Employees In The Field Of Operation Of Facility Equipment, Installations, Etc., • Development Of The Objects Use Instructions, • Purchase And Installation Of Equipment In Accordance With Pfu.2. The Subject Of The Contract Was Specified In Detail In The Functional And Utility Program Constituting Annex 12 To Swz.3. The Contractor Is To Be Implemented On The Basis Of The Design Documentation He Developed, Verified And Approved By The Contracting Authority In The Scope Of Compliance With Pfu, The Requirements Of Swz And Applicable Law On The Basis Of Th