GTR 98781403
Tenders Are Invited For Construction Of A Bicycle Route On The Section Ostrzyce-Kolano (Stage Iv)
ICB — International Competitive Bid
Closed
central europe
Tender Information
GTR Reference
98781403
Tendering Authority
Subscribe to view
Tender No
W3.271.1.06.2025.JB
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Construction Of A Bicycle Route On The Section Ostrzyce-Kolano (Stage Iv)
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
18-07-2025
Closed
Work Detail
1. The Subject Of The Contract Is The Construction Of The 4Th Stage, A Two -Way Bicycle Route On The Section Of Ostrzyce - Knee As Part Of The Expansion Of Poviat Road No. 1922G, On The Section (According To The Construction Design) At 1+100 To Km 1+950, A Section With A Length Of 850 Mb. Construction Will Consist In The Expansion Of The Poviat Road By Building An Independent Bicycle Route On Its Side. As Part Of The Works, There Will Be, Among Others, Robots Such As The Liquidation Of The Existing Elastic Barrier, A Slice Of Conflicting Greenery (Trees And Shrubs). Execution Of A Storm Sewage Network With Wells And Street Inlets With Incorporation In Existing Culverts Under The Body Of The Poviat Road. Performing The Embankment Of The Embankment Slope By Installing Angular Brackets And Geosynthetic Polyester Drainage Mattresses Filled With Aggregate. Path Structure. Ac8s. Ac8s Asphalt Concrete. 6 Cm Laid In Two Layers 3+3Cm, Foundation Made Of Broken Aggregate 0/31.5 Gr. 20 Cm Of Stabilized Mechanical, Layer Of Aggregate Stabilized With Rm = 2.5 Mpa With A Thickness Of 10 Cm In The Places Of Laying Geosynthetic Mattresses And At The Place Of Mounting Angular Brackets A Layer Of Stabilized With Cement Rm = 2.5 Mpa With Gr. 20 Cm. A 2M Wide Bicycle Path With A Bituminous Surface In A Resistor And A Road Curb. Embankments Slopes, Locally Will Be Reinforced With L Angular Brackets And Polypropylene Anti -Erosion Nets And Grass Sown. U-12 Protective Barriers Will Be Installed Along The Entire Length Of The Path. The Concise Range Of Work Is Taken Into Monitoring Of Natura 2000 Areas, Constituting Annex 7 To Swz. Am Will Be Implemented With Respect For The Principle Of Not Having Serious Damage To The Environment (Dnsh), In Accordance With Art. 17 Of Regulation (Eu) 2020/852. In Particular: • Avoid Using Materials, Technologies And Products Harmful To The Environment, Including Those Containing Hazardous Substances, • During The Implementation Of Work, The Emissions Of Pollutants To The Air, Water And Soil, In Particular Dust And Noise Emissions Related To The Construction Works, • Construction Waste Must Be Developed In Accordance With The Provisions Of The Act On The Provisions Of The Act On The Provisions Of The Act On The Provisions Of The Act On The Provisions Waste, Taking Into Account The Hierarchy Of Waste Management And The Principles Of The Economy With A Closed Circulation, • Prevent The State Of The Natural Environment, Including Valuable Natural Areas, Natural Habitats And Biological Diversity.
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
226142f8-070c-482c-aa6b-1508752cea6f.html
Attachments
Additional Details Available on Click
- Tendering Authority
- Publication Document (Tender Document / Tender Notice)
Disclaimer
We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.