Tenders Are Invited For “Engineering, Including Design, Construction And Copyright Supervision To Strengthen Municipal Property In Three Lots:

Tender Detail

98778757
00171-2025-0013
Self-Funded
Tenders Are Invited For “Engineering, Including Design, Construction And Copyright Supervision To Strengthen Municipal Property In Three Lots:
NCB
Eastern Europe
Balkans,European Union,G20
25-07-2025

Work Detail

Engineering, Including Design, Construction And Copyright Supervision For Strengthening Municipal Property In Three Lots Of Engineering, Including Design, Construction Of Construction Works And Copyright Supervision For Strengthening Municipal Property In Three Lots: Lot 1: Engineering, Including Design, Construction Of Construction Works And Copyright Supervision To Strengthen The Building Of Hristo Botev Community Center, Bozhurishte Lot 2: Engineering, Including Design, Construction Of Construction Works And Copyright Supervision To Strengthen The Building Of Dg Buratino Lot 3: Engineering, Including Design, Construction Of Construction Works And Copyright Supervision To Strengthen The Building Of Tpk Flight The Present Public Procurement Is Subject To Engineering - Design, Construction And Implementation Of Copyright Supervision During The Execution Of The Construction. Activity 1 The Design Is Carried Out In The Technical Project Phase And In Accordance With The Spatial Planning Act, In Compliance With The Principles Of Efficiency, Efficiency And Economy In Order To Achieve The Main Purpose Of The Investment. When Preparing The Project, The Selected Contractor Should Comply With The Attached Structural Opinion On The Building And The Prescriptions Thereto. Minimum Scope And Content Of The Individual Design Parts: Part Architectural; Constructive Part Pbz /Safety And Health Plan / Part Of Puso /Construction Waste Management Plan / Geological Report Part Project And Trade Documentation- The Investment Project Should Be Presented In 5 / Five / Copy Of Paper And 1 Copy Of Magnetic / Electronic / Medium. The Electronic Media Should Only Contain The Final Project Developments, And They Must Be Completely Identical To Those Of The Paper. Note: If The Development Of Additional Parts To The Technical Project For The Qualitative Implementation Of Construction Works And/Or Coordination Of The Project And/Or Other Purposes For The Implementation Of The Project, The Contractor Is Obliged To Develop The Respective Design Part. Activity 2 Construction And Installation Works With Range All Designed Activities For The Structural Restoration Of The Building, Incl. The Finishing Works Required To Restore The Compromised Sections As A Result Of Construction Works And Structural Problems. The Construction Will Be Implemented With The Approved Investment Projects Made By The Contractor Within The Framework Of Activity 1 Design. Activity 3 Copyright Under Article 162 Of The Spatial Planning Act (Territorial Development Act). Control For The Designers Prescriptions Related To His Copyright For The Accurate Compliance With The Investment Project He Worked Out. The Complete Information On The Scope, Volume And Requirements For The Implementation Of The Lot Is Detailed And Regulated In The Technical Specification Annex No 1.1,1.2 And 1.3 For Each Lot, An Integral Part Of The Public Procurement Document.

Key Value

Tender Value
5,83,333 - BGN

Attachment

FileName File Description
Global Tender Document Tender Notice
Attachments
Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail